BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Clinton, Connecticut. Completed plans call for the renovation of a playground / park / athletic field.

Artificial Turf Replacement Bids received after the above date and time will be rejected. The Town Manager reserves the right to reject any, or any part of, or all proposals; to waive informalities and technicalities and to accept the Bid which the Town deems to be in the best interest of the Town, whether or not it is the lowest dollar amount. Project consists of the removal of the existing artificial turf and the furnishing and installation of a new artificial turf including in-fill Work included in this Bid generally consists of removal and disposal of the existing artificial turf and the furnishing and installation of new artificial turf as specified herein. Questions: All questions will be submitted by Thursday, September 7, 2023. Only questions submitted by e-mail will be addressed. Please submit all questions to: rpotter@clintonct.org Copy to: mschettino@clintonct.org A. Furnish all labor, materials, tools, and equipment necessary to install, in place, all synthetic turf material as indicated on the plans and as specified herein. The installation of all new materials shall be performed in strict accordance with the Manufacturer's written installation instructions, and in accordance with all approved shop drawings. B. Prior to order of materials, the Synthetic Turf Contractor shall submit the following: 1. Product data, including Independent Laboratory Test Results 2. Installation details 3. Sample Warranty 4. Field layout and striping plans 5. Details on construction, especially any details that may deviate from plans and specifications. C. Prior to the beginning of installation, the Synthetic Turf Contractor of the synthetic turf shall verify the base for planarity. Upon written confirmation from the base contractor that compaction/planarity and drainage/permeability specifications have been achieved, the installation of synthetic turf will proceed as arranged. D. Prior to Final Acceptance, the Synthetic Turf Contractor shall submit to the Owner three (3) copies of Executed Warranty Documents and Maintenance Manuals, which will include necessary instructions for the proper care and preventative maintenance of the synthetic turf system, including painting and striping.

Award

Playgrounds / Parks / Athletic Fields

$522,604.00

Public - City

Renovation

8

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
191
Bidding Soon
4,146
All Active Projects
1,737
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2023

October 18, 2023

img_map_placeholder

54 E Main St, Clinton, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.