BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2023 at 8:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Le Roy, Illinois. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Le Roy - 2023 Sanitary Sewer Improvements The Work of this contract is generally described as a sanitary sewer rehabilitation and extension project. The work is split into five parts and further broken down into base bid and alternative bid items as described below: BASE BID: Le Roy Estates Sewer Lining: consists of supplying the labor, equipment, and materials necessary to provide approx. 310 LF of 8-inch diameter Cured In Place Pipe (CIPP) Liner and line one manhole. The work also includes site work, seeding, and other services and items of construction. BASE BID: School Street Manhole Addition: consists of supplying the labor, equipment, and materials necessary to provide two "doghouse" style manholes on existing 8" diameter sanitary sewer. The work also includes site work, paving, seeding, and other services and items of construction. BASE BID Allen Street Sewer Extension: consists of supplying the labor, equipment, and materials necessary to provide approx. 83 LF of new 8-inch diameter sanitary sewer, as specified herein. Also included are related manholes, sanitary services, site work, paving, seeding, and other services and items of construction. ALTERNATE BID #1: The Work of Alternate Bid #3 of this Contract is generally described as a sanitary sewer lining project along Meadow Lane. The Meadow Lane project consists of supplying the labor, equipment, and materials necessary to provide approx. 111 LF of 8-inch diameter Cured In Place Pipe (CIPP) Liner. The work also includes site work, seeding, and other services and items of construction. ALTERNATE BID #2: The Work of Alternate Bid #2 of this Contract is generally described as a sanitary sewer extension project along High Street. The Allen Street Sewer consists of supplying the labor, equipment, and materials necessary to provide approx. 265 LF of new 8-inch diameter sanitary sewer, as specified herein. Also included are related manholes, sanitary services, site work, paving, seeding, and other services and items of construction. Please contact us at 217-352-9261 if you have any questions about the documents. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than seven days prior to the date for opening for Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Water / Sewer

$135,593.00

Public - City

Paving, Site Work

13

21

6

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
61
Bidding Soon
1,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

October 27, 2023

Project location map

Multiple Locations, Le Roy, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.