BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pisgah, Alabama. Completed plans call for site work for a water / sewer project.

Proposed Total DBE/MBE Participation:Goal: 2.5% BIDS for the construction of Replacement of Existing Water Mains Consisting of Approximately 10,380 LF of 8" PVC, 2,775 LF of 6" PVC, 2,450 LF of 3" PVC, 300 LF of 10" HDPE Directional Bore, 380 LF Road Bore and casing, 99 Service Reconnects, 6 Fire Hydrants and related appurtenances. Prime contractor bidders will be refunded 100% of the plan deposit for one set returned to the Engineer, in reusable condition, within 10 days after the bid opening. Additional sets obtained shall be refunded 50% of the plan deposit. All non-bidders, subcontractors, vendors or dealers shall be refunded 50% of the plan deposit for each set returned to the Engineer, in reusable condition, within 10 days after the bid opening. The plan deposit amount as indicated above is in accordance with Alabama Act No. 97-225, (Title 39, Code of Alabama, 1975, As Amended), relating to the competitive bid laws for public works. All Bidders must comply with the requirements of the State Licensing Board for General Contractors (Latest Edition) and with the Alabama Act No. 97-225 (Title 39, Code of Alabama, 1975 as Amended) relating to competitive bid laws for public works. All Bidders must be properly licensed in accordance with the requirements of the State Licensing Board for General Contractors (Chapter 8, Title 34, Code of Alabama, 1975 or latest). Any contract or contracts awarded under this invitation for bids are expected to be funded by a loan from the State Revolving Fund from the Alabama Water Pollution Control Authority, administered by the Alabama Department of Environmental Management. Neither the State of Alabama, nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to regulations contained in the laws of the State of Alabama and as applicable. All prospective bidders and other interested parties are requested to attend. The Pre-Bid Conference is NOT mandatory, but is strongly encouraged. Minutes of the meeting will be prepared and issued to all plan holders.

Award

Water / Sewer

$1,146,200.00

Public - City

Site Work

12

13

9

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
41
Bidding Soon
658
All Active Projects
272
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

November 27, 2023

img_map_placeholder

Multiple Locations, Pisgah, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.