BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 1, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a water / sewer project in White Hall, West Virginia. Completed plans call for site work for a water / sewer project.

STORM SEWER IMPROVEMENTS PROJECT EMERALD, LAVENDER & GARNET LANE, PHASE 1-B The project proposes to install new storm sewer pipe, related structures, and appurtenances across Gamet Lane, residential lots, and along Lavender Lane within the Town of White Hall. The project proposes to remove approximately 40 linear feet of existing storm sewer and I storm inlet structure and install approximately 285 linear feet of 24-inch, 76 linear feet of 18-inch, and 36 linear feet of 12-inch HDPE storm sewer pipe, 6 storm inlet structures, 60 linear feet of concrete, grated trench drain, 3 new 6-inch storm sewer taps as well tying in existing storm sewer pipes, appurtenances and revegetation of the area. The repair and repaving of streets disturbed within and adjacent to the project area is proposed.

Award

Water / Sewer

$127,361.00

Public - City

Site Work

8

7

5

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
1
Bidding Soon
750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2023

November 8, 2023

Project location map

Multiple Locations, White Hall, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.