Site work and new construction of an educational facility in Morris, Minnesota. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
The selected Respondent shall furnish and install a new ground mounted solar PV array near the existing array. The new array shall match the existing array and be provided with robust support beams and shall be mounted 8 feet off the ground. Provide pricing for the options listed below: o Base Option #1: 175 kW AC in power output o Alternate #A: Add an additional 105kW AC in power output o Alternate #B: 175 kW Heliene, Minnesota made solar modules o Need to know price difference between Base Option and Heliene panels o Alternate #C: Add additional 105 kW Heliene, Minnesota made solar modules o Need to know price difference between Alternate #A and Heliene panels The new array shall be located at the University of Minnesota, 600 East 4th Street, Morris, MN 56267 in the pasture south of Prairie Lane shown in the Figure E1. There is an existing 500kVA padmount transformer serving the existing array that is appropriately sized to support the new array. The existing padmount transformer, and both low and high voltage power lines are owned by the University of Minnesota Morris. No agreements are needed with the power company; the University will submit the interconnection application and the power purchase agreement is already in place. Respondent will need to work with the utility, Otter Tail Power Company, to acquire a production meter. Proposals shall include all ground work, structure and racking to mount the modules, all trenching and wiring to connect to the padmount transformer, connecting the new array to our monitoring system to be able to collect array output data via the internet and Modbus protocol (existing communications include point-to-point internet connection from the campus with an internet gateway that has additional capacity for connection to the new array), and securing permits from the University of Minnesota codes department including any engineering work needed to support the permits (i.e. civil, structural and electrical drawings). Proposals should also include upgrading the current overhead line fuses on the GOAB switch (currently rated at 140 A, but need 200 A for this addition) Construction Services for addition of a new solar array on the Morris campus. Question Deadline 09/19/2023 at 12:00 PM CT The University requires the Project to be substantially complete by no later than December 2, 2024. The total construction budget for this Project is $700,000 (current dollars, no escalation).
Award
Educational
$700,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2023
October 13, 2023
600 E 4th St, Morris, MN
Related To This Project
Morris, MN
Bid Date: Dec 16 2021
Morris, MN
Bid Date: Feb 16 2022
Morris, MN
Bid Date: Feb 09 2022
Morris, MN
Bid Date: Aug 03 2022
Morris, MN
Bid Date: Jan 28 2025
Morris, MN
Bid Date: Apr 20 2021
Morris, MN
Bid Date: Apr 08 2024
Morris, MN
Bid Date: Apr 15 2024
Morris, MN
Bid Date: May 09 2023
Morris, MN
Bid Date: Jan 30 2024
Morris, MN
Bid Date: Apr 10 2023
Morris, MN
Bid Date: Apr 11 2023
Morris, MN
Bid Date: Mar 14 2023
Morris, MN
Bid Date: Mar 14 2023
Morris, MN
Bid Date: Jun 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.