Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Onamia, Minnesota. Completed plans call for site work for a water / sewer project.
General Notes: 1. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the MN Chapter 7080. 2. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. 3. Contractor must reconnect all utilities, service panel or service feed. 4. Contractor will secure all permits and fees. 5. Contractor is responsible for a thorough investigation of the scope of work. 6. Contractor will repair any damage to the property or structure created by the scope of work. 7. Contractor shall be responsible for all debris removal related to all work performed under this work scope. 8. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Work Scope Description: Please note that bids will only be accepted from licensed septic installers performing 34% or more of the work scope themselves. Bids will not be accepted from general contractors or contractors with restricted licenses. Contractor shall provide all equipment, materials and labor to complete the work described or referenced in this rfp, provided IHS Specifications, MN Chapter 7080 and within the provided Environmental Systems design. 1. Install an on-site septic system per the approved septic design provided by Environmental Systems dated 5/26/23. Contractor shall ensure a complete and functional system. 2. The contractor shall have the existing septic tank pumped and crushed or filled. Contractor shall assume existing tank holds up to 2,000 gallons. Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator. 3. Contractor shall be responsible for contacting the inspector identified by the Mille Lacs Band to schedule inspection of scratch, tanks, rock bed and final cover. Minimum of 24 hour notice is required. 4. Contractor shall also be responsible contacting Project Coordinator, Carla Dunkley, to schedule project site visits to see scratch, tanks and rock bed before covering. 5. Contractor shall also be responsible contacting the Mille Lacs Band's THPO Office prior to any ground breaking activities to arrange for a THPO Monitor. Mike.wilson@millelacsband.com or 320-532-7450 6. Contractor shall provide an As-Built System drawing for submission to MLBO. 7. Contractor will not receive final payment until the Band's contracted inspector has completed a successful final inspection an issued a Certificate of Compliance; and Owner has been supplied with full lien waivers for all subcontractors and suppliers. 8. Contractor is responsible for constructing a temporary driveway across the ditch to the west side of the property and removing materials after project completion. Contractor shall also be responsible for removing and reinstalling/ replacing a section of the chain link fence to access the west yard of the home. 9. Contractor is responsible for removal and disposal of existing mound materials per design and disposing of them off-site. For bidding purposes, contractor shall assume that all existing sand must be replaced. Bid Alternate #1: Provide deduct unit cost per inch of sand that is determined to be clean and not required to be replaced by the contracted inspector. 10. Contractor shall include the cost of removing and disposal of all existing materials; and supply and install of all new materials, including be not limited to cover materials, topsoil, sand, rock, fabric and piping. 11. Contractor shall be responsible for pumping tanks for the duration of project, including the period of drying once the old mound materials are removed. 12. Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080. 13. Contractor shall follow proper MN Chapter 7080 mound prep procedure, keeping traffic off the designated mound area. Contractor shall be responsible for the cost of any: compaction testing; re-design fees; or additional costs associated with system redesign or relocation; if these expenses are incurred due to contractor or subcontractor damaging the mound location. 14. Contractor shall provide and install Polylok PL120 filter with alarm and flow meter with event counter per design. 15. Contractor shall be responsible for electrical connections and any required trenching. 16. Contractor will be responsible for all yard repairs caused by system installation, including grading, black dirt cover and seeding. 17. Contractor is responsible for calling Gopher One before digging. 18. Although we acknowledge the weather and soil condition dependent nature of the work, it is expected that the work be completed as soon as possible; but the contract will be drafted with a completion deadline date of July 31, 2024. 19. Contractor shall include 0.5% TERO tax fee in base bid. Submission of receipt for paid TERO fee is required with application for final payment. Specified Product Substitutions: No substitutions will not be allowed on products specified within the design. Contacts: Interested bidders shall contact Carla Dunkley, Project Management Compliance Officer at 320-630-2495 or by E-mail at carla.dunkley@millelacsband.com for a copy of the IHS Specifications, including Environmental Systems design; and to be included on the bidder's list in the event that any addendums are issued for this project. COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON. Bidding Notes: 1. All proposals shall include the following: a. Sign and completed Mille Lacs Band Bid Form. b. Completed and signed bid schedule included in IHS specifications. c. Copy of current MLB Vendor's License. (or a copy of submitted application) d. Copy of current certificate of insurance for General Liability and Property Damage. e. Copy of an authorized signature sheet if one is not already on file with the Mille Lacs Band. 2. All Contractors (including subcontractors) must comply with Davis Bacon wage requirements. 3. All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA 5). Contact Lori Trail at (320) 532-4778.
Post-Bid
Water / Sewer
$25,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 20, 2023
October 23, 2023
19500 S. Whitefish Drive, Onamia, MN
Related To This Project
Onamia, MN
Bid Date: Dec 29 2021
Onamia, MN
Bid Date: Feb 23 2022
Onamia, MN
Bid Date: Feb 16 2022
Onamia, MN
Bid Date: Feb 09 2022
Onamia, MN
Bid Date: Mar 16 2022
Onamia, MN
Bid Date: Mar 09 2022
Onamia, MN
Bid Date: Sep 29 2023
Onamia, MN
Bid Date: Sep 06 2023
Onamia, MN
Bid Date: Sep 06 2023
Onamia, MN
Bid Date: Aug 25 2023
Onamia, MN
Bid Date: Sep 12 2023
Onamia, MN
Bid Date: Aug 02 2023
Onamia, MN
Bid Date: Aug 02 2023
Onamia, MN
Bid Date: Jul 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.