BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work and addition to a municipal facility in Painesville, Ohio. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

Reference #: CBR23042498 The building to be demolished is an office building at 168 North St. Clair Street, Painesville, Ohio 44077. The building consists of a masonry walls, bar joists and wood frame roof, and typical materials used in the 1960's. Asphalt parking lot, site utilities, sidewalks, and miscellaneous site amenities must also be removed. Asbestos and universal waste materials to be removed in advance of building/site demolition. Site improvements includes filling building foundations with clean materials, finish grading, providing for positive drainage and seeding site. The work requires the Contractor(s) to furnish all labor, material, tools, equipment, utilities, and other services and to comply with applicable laws and requirements, and to obtain all requisite permits and approvals. Work will be performed as follows: 1. Mobilization, permitting support, insurance and bonding, contract management and support services and preparation of submittals such as work plans and certification of training and experience, site security arrangements, health and safety planning and ensuring de-energizing of building systems. 2. Removal of hazardous or toxic materials from all buildings, such as asbestos, CFC's (refrigerants), mercury, and other metals, universal wastes (ballasts, light tubes, switches). 3. Demolition of building, remaining site utilities, removal of select pavement areas, excavation and engineered backfill. 4. Backfilling, grading and site restoration, construction of positive flow drainage system. Activities are to be conducted in a manner that ensures proper management and off-site disposal of material that cannot be reused. All work is to be performed in compliance with applicable regulations. Please contact the Plan Room at (440) 530-2395 or planroom@ctconsultants.com if you experience problems viewing, registering or paying for the documents. All project-related questions during bidding should be addressed to the contact listed in the comments field for that particular project. Special Conditions of Use for Electronic Files and Hard Copies of Plans and Specifications: The electronic files and hard copies thereof of the plans and specifications may be utilized by prime contractors to see if they wish to purchase the entire set of plans and specifications and by subcontractors, vendors, suppliers, and manufacturers to prepare quotes to prime contractors for that project. Any other use is strictly prohibited. The electronic files and hard copies thereof of the plans and specifications may be utilized by construction news agencies to inform contractors, subcontractors, vendors, suppliers, and manufacturers of projects available for bid and the scope of the project. Any other use is strictly prohibited. No electronic files may be sold or distributed for a per project or per file fee. No hard copies thereof may be distributed except that one copy may be printed for use in each Plan Room and must be destroyed within 7 days after the Bid Opening. All electronic files presented on the CT Consultants, Inc. website or hard copies thereof and all electronic files and/or hard copies of the plans and specifications purchased or otherwise received directly or indirectly from CT Consultants are copyright protected materials and except as noted above are not to be reproduced in any form or otherwise utilized in whole or in part without expressed written permission from CT Consultants, Inc. The Opinion of Probable Construction Cost $425,000.00 to $475,000.00. Question Deadline 09/11/2023 at 9:00 AM ET Bid Results: ntractA Building Demolition BF.ll - 12 Moderalli Excavating, Inc. 171,729 Contract B Asbestos Abatement & Hazardous Material Removal- BF. 13A - 15A Moderalli Excavating, Inc. 117,00 Safeair Contractors Inc. 117.000 Contract C Combined (A & B) BF16A-18A Moderalli Excavating, Inc. 288,729

Award

Municipal

$460,458.00

Public - County

Addition, Demolition, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
74
Bidding Soon
823
All Active Projects
332
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

October 16, 2023

img_map_placeholder

168 N St Clair St, Painesville, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.