BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Beaufort, South Carolina. Completed plans call for site work for a water / sewer project.

As of February 16,2024, this project has not yet been awarded. A timeline for award has not yet been established. First Boulevard Forcemain Replacement The work to be done consists of furnishing all materials, equipment and labor necessary to replace the BJWSA First Boulevard 6" forcemain. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner, and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. The successful bidder, upon failure or refusal to execute and deliver the contract and bonds required within ten (10) days after they have received notice of the acceptance of their bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with the bid. SS03 The Owner reserves the right to waive any informalities or to reject any or all bids. To be given consideration, the request must be received by January 19, 2024 at 4:00PM A. This Section of the specifications covers the scope and sequence of work. The scope of work includes construction of approximately: Replace approximately 1,300 linear feet of existing 6-inch cast iron forcemain with new 6-inch C900 DR25 PVC forcemain installed via open-cut, to include all associated fittings and appurtenances including (4) air release valves and (1) flow control manhole with approximately 90 linear feet of 8-inch gravity sewer. New forcemain shall be encased below road crossings and shall connect to (3) existing vertical offset areas. The discharge manhole shall be lined with protective interior coating. Provide all required bypass to maintain sewer and forcemain flows throughout the project. B. The Contractor shall furnish all labor, materials, equipment, and incidentals required to complete the work as shown on the drawings and as specified herein. C. Forcemain replacement includes: 1. Replacing existing sewer forcemain and installing new appurtenances (refer to Section 02088 PVC PRESSURE PIPE and Section 02532 VALVES AND APPURTENANCES FOR WASTEWATER WORK); 2. Installing a new flow control manhole and gravity sewer piping (refer to Section 02631 PRECAST CONCRETE MANHOLES AND CATCH BASINS and Section 02085 PVC GRAVITY SEWER PIPING); 3. Connecting to an existing sewer manhole (refer to Section 02533 CONNECTIONS TO EXISTING STRUCTURES); 4. Rehabilitating one manhole including exterior sealing and interior coating, epoxy lining, and repairs. (refer to Section 02435, SEWER MANHOLE REHABILITATION)

Bid Results

Water / Sewer

$647,574.00

Public - State/Provincial

Site Work

12

9

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
61
Bidding Soon
879
All Active Projects
397
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2024

April 1, 2024

September 28, 2024

img_map_placeholder

1st Blvd, Beaufort, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.