BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Kennard, Texas. Contact the soliciting agency for additional information.

Description of Requirement The Davey Crockett Ranger District on the Davey Crockett National Forest is soliciting quotes for Boundary, Leave and Cut tree marking and sample tree cruising: Timber Marking Boundary Tree Marking The project area is located in Compartment 14 on the Davy Crockett Ranger District. The treatment areas requiring boundaries are within the Beaver Creek project area and consists of 22.4 miles of boundary for thinning operations. Unit boundaries in compartment 14 have been flagged and mapped using Avenza and Two Trails. Paper and electronic maps will be provided when work begins on the contract. All unit boundaries of the contract will be marked in orange tracer paint with 3 diagonal slashes at DBH and 2 stump marks. Boundary trees should be marked frequently enough to easily see marked trees in either direction along the boundary line, however the distance between marks should be between 20'-150' apart. Boundaries adjacent to any major road don't require a marked boundary as the road marks the boundary. Leave Tree Marking The project area is located on the Davy Crockett Ranger District. The treatment area is in the Beaver Creek project area consisting of 8 units (163 acres) of first thinning plantations within compartment 14. Five leave tree units are located on the Deer Hunter timber sale while three more are located on the Hickory timber sale. Units are to be determined and maps will be provided at the time of award on the contract. Units will be marked in orange tracer paint with a 4" full wrap breast mark and 2 stump marks for sawtimber and 1 stump mark for pulpwood. All units will be marked to leave an average of a 60 BA. Some units will have visual quality requirements where directional marking and increases in basal area retained is necessary. Cut Tree Marking The project area is located on the Davy Crockett Ranger District. The treatment area in compartment 14 consists of 17 units totaling 380 acres. Five cut tree units are located in the Deer timber sale and the remaining 12 on the Hickory timber sale. Only pine will be marked in compartment 14. Units will be marked in blue or yellow tracer paint and sample tree tally cruised. Two stump marks for all marked sawtimber trees and 1 stump mark for all marked pulpwood trees. All units will be marked to leave an average of a 60 BA. Crew must be cruiser qualified to mark. Some units will have visual quality requirements where directional marking and increases in basal area retained is necessary. Trees will be selected and marked based on the description in each individual cruise plan so that the desired basal area/acre (BA) and spacing would result after harvest. Date(s) and Place(s) of Delivery and Acceptance/Location The project area is located within the Davey Crockett National Forest on the Davey Crockett Ranger District. Forest Service personnel are located at and will administer the requirement from their offices at 18551 State Highway 7 East, Kennard, Texas 75847. Precise locations of the work locations can be found in the project mapping contained in attachment A. Project Area: All of these areas are accessible by vehicle or by foot and are generally level slope with an elevation of about 240 feet.

Post-Bid

Municipal

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
27
Bidding Soon
470
All Active Projects
184
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

October 12, 2023

img_map_placeholder

Multiple Locations, Kennard, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.