BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hailey, Idaho. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed Work includes the installation of concrete curb/gutter/sidewalk, asphalt parking areas and bike path, street trees, street lighting, irrigation, and other ancillary components for the construction of a bulb out at the south east corner of River and Spruce Street. The City of Hailey shall provide to the bidder, prior to the opening of the bid proposals, all information which is pertinent to, and delineates and describes, the land owned and rights-of-way acquired or to be acquired. The contract documents contain the provisions required for the construction of the project. Information obtained from an officer, agent, or employee of the City of Hailey, or any other person, shall not affect the risks or obligations assumed by the contractor or relieve him from fulfilling any of the conditions of the agreement. A performance bond and a payment bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the City of Hailey, will be required for the faithful performance of the contract. Attorneysin-fact who sign performance bonds or payment bonds must file with each bond a certified and effective dated copy of their power of attorney. Work shall commence no later than September 11th, 2023 and must be completed within 61 calendar days on November 10, 2023 unless otherwise extended by the contract documents. If the contract is extended, Work shall resume May 6, 2024 and must be completed within 11 calendar days on May 17, 2024. The City of Hailey reserves the right to reject any and all bids. Questions regarding the contract documents or scope of work should be submitted in writing to Nancy.Arellano@haileycityhall.org or Brian.Yeager@haileycityhall.org.

Award

Sidewalks / Parking Lot

$328,477.00

Public - City

Paving, Site Work

4

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
55
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.