Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 9, 2024 at 8:00 PM
Updated April 10, 2024
Demolition, site work, paving and new construction of a pre-engineered storage facility in Harpers Ferry, Iowa. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a 8,456-square-foot pre-engineered storage facility; 4,662-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.
As of April 9, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Bid Item #1: Multipurpose Building: Construction of a one story multipurpose building & exterior observation deck. Also includes demo, & construction of all temporary erosion and sediment control measures, water well, treatment, storage, and distribution systems, sanitary sewerage & septic system, underground electrical & telecommunications conduits & associated wiring, propane storage & distribution systems, landscaping including all trees, plants, grasses, & boulder retaining walls, gravel pathways & stone stairs, bike racks & bike parking area, flagpole, & site furniture. #2: Entrance Road and Maintenance Road: construction of the asphalt entrance road, gravel maintenance road, & all associated improvements required to construct these roads. Also includes constructing the refuge entry monument sign, electronic swing access gates, trailhead parking lot & sidewalk, and adjacent gravel shoulders, curbs & gutters, stormwater management systems, signage, & overhead lighting #3: Visitor Parking Area: asphalt visitor parking area & all associated improvements required to construct the parking area. Also includes constructing the headquarters sign, and the adjacent concrete ADA parking stalls, curbs & gutters, stormwater management systems, sidewalks, signage, overhead lighting, & an electric vehicle charging station The work includes but is not limited to construction of a one story multipurpose building and exterior observation deck. The work also includes demolition, and construction of all temporary erosion and sediment control measures, water well, treatment, storage, and distribution systems, sanitary sewerage and septic system, underground electrical and telecommunications conduits and associated wiring, propane storage and distribution systems, landscaping including all trees, plants, grasses, and boulder retaining walls, gravel pathways and stone stairs, bike racks and bike parking area, flagpole, and site furniture #4: Staff Parking Area and Overflow Grass Parking Area: asphalt staff parking area, overflow grass parking area, and all associated improvements required to construct these parking areas. Also includes constructing the adjacent concrete ADA parking stalls, curbs and gutters, stormwater management systems, sidewalks, signage, overhead lighting, & an electric vehicle charging station #5: Maintenance Shop and Gravel Maintenance Yard: of a rigid steel framed maintenance shop, gravel maintenance yard, & all associated improvements #6: : Cold Storage Building: construction of a rigid steel framed cold storage building Question Deadline 02/19/2024 at 2:00 PM CT Any and all questions should be submitted via email only. Contracting Specialist, Samantha LaGue can be reached at: Samantha_LaGue@fws.gov
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$10,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2024
May 20, 2024
481 Luster Heights Rd, Harpers Ferry, IA
Related To This Project
Harpers Ferry, IA
Bid Date: Oct 21 2021
Harpers Ferry, IA
Bid Date: Feb 08 2022
Harpers Ferry, IA
Bid Date: Mar 21 2024
Harpers Ferry, IA
Bid Date: May 23 2024
Harpers Ferry, IA
--
Harpers Ferry, IA
--
Harpers Ferry, IA
Bid Date: Jun 13 2022
Harpers Ferry, IA
Bid Date: Apr 07 2021
Harpers Ferry, IA
Bid Date: Aug 08 2022
Harpers Ferry, IA
Bid Date: Nov 03 2022
Allison, IA
Bid Date: Sep 21 2023
Kalona, IA
Bid Date: Sep 19 2023
Knoxville, IA
Bid Date: Sep 21 2023
Indianola, IA
--
Traer, IA
Bid Date: Sep 21 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed