Site work and paving for a mixed-use development in Reedsburg, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reedsburg - My Home Estates Est. Completion Date: June 30, 2024 My Home Estates to include: the extension of Road A (+/- 500 LF), Road B (+/-2,100 LF, and Road C (+/- 250 LF) including clearing and grubbing, grading, rock excvation, base course, sanitary sewer, water main, storm sewer, curb and gutter, sidewalk, asphalt paving, restoration of the work area and other miscellaneous items in conformance with the Contract Documents. 1. Award Contract (October 2023). 2. Notice to Proceed (October 2023). 3. Start Construction: Work may begin any time following the execution of the Contract documents and after the preconstruction meeting. Construction shall start no later than October 16, 2023. All work must proceed in a continuous manner once work begins. 4. Utilities and Base Aggregate must be installed on Road A and Road B, from Road A through Lot 7, by December 15, 2023. It is anticipated the Developer will start construction on the duplexes on Lots 2-7 in November 2023. Contractor shall build the pedestrian trail to the East to provide access to the building sites. Contractor to coordinate with owner, builder, and engineer as required. 5. Remaining utility and street work may be completed on the contractor's schedule to meet substantial completion date. 6. Substantial Completion: The asphalt patch in 8th Street shall be completed by November 1, 2023, or by the end of the 2023 paving season as approved by the engineer. The rest of the project shall be completed no later than June 15, 2024, as provided in paragraph 2.03 of the general conditions. Restoration of the site by June 15, 2024. 7. Final Completion: The work shall be complete and ready for final payment by June 30, 2024, as provided in paragraph 2.03 of the general conditions. Final completion shall include all work as shown on the Contract Drawings and detailed in these specifications, including all the items addressed in final project closeout punch list. All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. Question Deadline 09/16/2023

Award

Roads / Highways

$2,137,413.00

Public - City

Paving, Site Work

25

16

4

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
21
Bidding Soon
458
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2023

October 16, 2023

img_map_placeholder

Multiple Locations, Reedsburg, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.