BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Escatawpa, Mississippi. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This work shall consist of constructing and installing routine bridge repair items including General Epoxy Repair, Bi-directional or Uni-directional Fiber Reinforced Polymer (FRP) Wrap, Cap Cleaning, Bearing Replacements, Epoxy Injection, and Encapsulated Field Painting in accordance with the details on the plans, and the requirements set out herein. Minor changes in detail of design or construction procedure may be authorized by the Director of Structures, State Bridge Engineer provided such changes will not be cause for contract price adjustment. A pre-bid meeting will be held in the Commission Room on the 1st Floor of the MDOT Administration Building in Jackson, at 2:00 P.M. on the day preceding the date of the bid opening. Bridge preservation on sr 63 over the escatawpa river (bridge no. 1.4), known as federal aid project no. Stp-0002-01(055) / 107869301 in jackson county. Project completion: august 30, 2024 Value Estimate Range - $1,000,000 - $5,000,000 For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. Bid Bond, Signed or Countersigned by a Mississippi Resident Agent or Qualified Non-resident Agent, With Power of Attorney Attached or on File With the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for Five (5%) Percent of Bid, Payable to State of Mississippi, Must Accompany Each Proposal. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. The attention of bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. MSDOT - 02 - Bridge Preservation on SR 63 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$16,907,048.00

Public - State/Provincial

Paving, Site Work

175

9

4

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
46
Bidding Soon
630
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

November 9, 2023

Project location map

MS-63, Escatawpa, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.