Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 26, 2023 at 8:00 PM
Updated April 17, 2025
Site work and new construction of a pre-engineered storage facility in Fremont, California. Completed plans call for the construction of a 6,713-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.
The work involves the installation of a new pre-engineered metal building for the Fremont Police Department to store vehicles. The work includes a pre-fabricated building with new concrete pad, fire alarm, fire sprinklers, electrical work, data lines, cameras, card access, intrusion alarm, and all other necessary work as specified in the drawings and specifications provided in the contract documents. The estimated construction cost, or construction cost range, for the Project is $1,400,000. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price. The planned timeframe for commencement and completion of construction of the Project is: One Hundred Twenty (240) calendar days from the date specified in the Notice to Proceed to Final Completion. License. This Project requires a valid California contractor's license for the following classification(s): Class A or Class B, and all Specialty Licenses required for the project. Minimum Wage. This Contract may be subject to the City Minimum Wage Ordinance, codified in Fremont Municipal Code Chapter 5.30. Contractor represents it has read and understands the City's minimum wage requirements and agrees to fully comply with the ordinance. Contractor shall promptly provide any documents and information required by City to verify compliance.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$2,582,777.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2023
December 4, 2023
1958 Stevenson Blvd, Fremont, CA
Related To This Project
Fremont, CA
Bid Date: Nov 16 2023
Fremont, CA
--
Fremont, CA
Bid Date: Dec 07 2021
Fremont, CA
Bid Date: Dec 29 2021
Fremont, CA
--
Fremont, CA
Bid Date: Dec 20 2021
Fremont, CA
--
Fremont, CA
--
Fremont, CA
--
Fremont, CA
Bid Date: Dec 20 2021
Fremont, CA
Bid Date: Aug 29 2023
Fremont, CA
Bid Date: Sep 13 2023
Fremont, CA
--
Fremont, CA
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
