BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 26, 2023 at 8:00 PM

Updated April 17, 2025

Site work and new construction of a pre-engineered storage facility in Fremont, California. Completed plans call for the construction of a 6,713-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The work involves the installation of a new pre-engineered metal building for the Fremont Police Department to store vehicles. The work includes a pre-fabricated building with new concrete pad, fire alarm, fire sprinklers, electrical work, data lines, cameras, card access, intrusion alarm, and all other necessary work as specified in the drawings and specifications provided in the contract documents. The estimated construction cost, or construction cost range, for the Project is $1,400,000. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price. The planned timeframe for commencement and completion of construction of the Project is: One Hundred Twenty (240) calendar days from the date specified in the Notice to Proceed to Final Completion. License. This Project requires a valid California contractor's license for the following classification(s): Class A or Class B, and all Specialty Licenses required for the project. Minimum Wage. This Contract may be subject to the City Minimum Wage Ordinance, codified in Fremont Municipal Code Chapter 5.30. Contractor represents it has read and understands the City's minimum wage requirements and agrees to fully comply with the ordinance. Contractor shall promptly provide any documents and information required by City to verify compliance.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$2,582,777.00

Public - City

New Construction, Site Work

71

25

4

10

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
210
Bidding Soon
3,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

December 4, 2023

Project location map

1958 Stevenson Blvd, Fremont, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.