BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Newport News, Virginia. Completed plans call for the renovation of a laboratory facility.

Shielding Blocks for Hall Bunkers Scope of Work Inclusions includes all labor, material, equipment and insurance to complete the following scope of work Shielding Blocks Furnish Rebar and concrete shop drawings for approval Furnish Plain Reinforcing Steel fabricated and bent to detail drawings Jefferson Lab reserves the right to randomly inspect the form work and rebar placement prior to Concrete pour to ensure that the structure is according to the Drawings. Install rebar as shown Install Lifting pads furnished by others Place and finish specified concrete Deliver Blocks to Jefferson Lab after cure for Unloading by others Any amendments or other information associated with the requirement will be posted electronically Small Business Set Aside: Yes Question Deadline 09/18/2023 at 5:00 PM ET. Questions regarding the solicitation must be submitted in writing will need time to respond to the questions and in turn provide you the opportunity to incorporate any new information into your proposals. Should you have any questions, please send an email to jessie@jlab.org or call me at 757-269- 7061. If I am not available, you may contact Mitch Laney (laney@jlab.org) at (757) 269-5338. It is JLab's intent to award a subcontract within 1-2 weeks after proposals are received (as soon as all proposals are evaluated and a supplier is selected). Please state on your business proposal that pricing is valid for at least (30) days. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. Any proposal, modification, or revision received by J Lab after the designated time and date specified in the solicitation package is "late" and will not be considered unless the Procurement Officer determines that accepting the late offer would not unduly delay the acquisition. Subcontractor shall provide all labor, materials, facilities, equipment, and supervision to fabricate, inspect, and delivery of the Sheilding Blocks for Hall Bunkers per the Statement of Work. Please ensure to hold pricing for (30) days after RFQ Submittal.

Post-Bid

Laboratories

$18,000.00

Public - Federal

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
41
Bidding Soon
679
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

October 23, 2023

img_map_placeholder

12000 Jefferson Ave, Newport News, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.