Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 20, 2025 at 7:00 PM
Updated January 21, 2025
Site work, paving and new construction of a mixed-use development in Waukee, Iowa. Completed plans call for site work for a playground / park / athletic field; for the construction of a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The Painted Woods West Park improvements include: Construction of a premanufactured kit-built restroom building, including but not limited to: full restroom, mechanical room, electrical, water, and sanitary connections, final electrical and plumbing trim out, and all associated finish work (sealing, caulking, signage, doors/hardware, amenities, etc) Site work includes: Site preparation; construction staking; PCC sidewalk/trail w/ detectable warning plates where shown, PCC drive and parking with integral curbs, pavement striping, PCC subbase and integral curbs, PCC beam curbs, PCC half flex court w/ striping, PCC footings, foundations and stoops as indicated on plans, along with associated earthwork and aggregate subbase work; parking signs and posts; installation of open-air shelters, and column wraps on all shelter and restroom building posts; complete basketball hoop system; stone seat blocks, boulders and flagstone; landscaping includes evergreen trees, deciduous overstory and understory trees, shrubs, perennials, seeded lawn, and native seed areas, mulch, planting soils, and watering of landscaped areas; bioretention basin with engineered soil and aggregates; sediment and erosion control measures shall be installed and maintained as shown on plans; site utilities include storm sewer, sanitary sewer, water, and electrical, including connection to new transformer; electrical work also includes drive/parking lot light poles and luminaires, restroom and shade structure lighting, and installation of security system as shown in Contract Documents with all associated conduits, cabling, and devices. Playground equipment, poured in place rubber surfacing procurement and install is by manufacturer's preferred contractor (direct to Owner) - not in contract. Site furnishings, unless noted otherwise in Plans, are by owner. Premanufactured kit-built restroom building and open-air shelters are procured by Owner, installed by General Contractor Work on said project shall commence within ten (10) days of a written notice to proceed
Award
Playgrounds / Parks / Athletic Fields
$1,674,999.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2024
February 17, 2025
To Be Determined, Waukee, IA
Related To This Project
Waukee, IA
--
Waukee, IA
--
Waukee, IA
Bid Date: Jan 30 2024
Waukee, IA
Bid Date: Dec 17 2024
Waukee, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
