Published January 20, 2025 at 7:00 PM

Updated January 21, 2025

Site work, paving and new construction of a mixed-use development in Waukee, Iowa. Completed plans call for site work for a playground / park / athletic field; for the construction of a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Painted Woods West Park improvements include: Construction of a premanufactured kit-built restroom building, including but not limited to: full restroom, mechanical room, electrical, water, and sanitary connections, final electrical and plumbing trim out, and all associated finish work (sealing, caulking, signage, doors/hardware, amenities, etc) Site work includes: Site preparation; construction staking; PCC sidewalk/trail w/ detectable warning plates where shown, PCC drive and parking with integral curbs, pavement striping, PCC subbase and integral curbs, PCC beam curbs, PCC half flex court w/ striping, PCC footings, foundations and stoops as indicated on plans, along with associated earthwork and aggregate subbase work; parking signs and posts; installation of open-air shelters, and column wraps on all shelter and restroom building posts; complete basketball hoop system; stone seat blocks, boulders and flagstone; landscaping includes evergreen trees, deciduous overstory and understory trees, shrubs, perennials, seeded lawn, and native seed areas, mulch, planting soils, and watering of landscaped areas; bioretention basin with engineered soil and aggregates; sediment and erosion control measures shall be installed and maintained as shown on plans; site utilities include storm sewer, sanitary sewer, water, and electrical, including connection to new transformer; electrical work also includes drive/parking lot light poles and luminaires, restroom and shade structure lighting, and installation of security system as shown in Contract Documents with all associated conduits, cabling, and devices. Playground equipment, poured in place rubber surfacing procurement and install is by manufacturer's preferred contractor (direct to Owner) - not in contract. Site furnishings, unless noted otherwise in Plans, are by owner. Premanufactured kit-built restroom building and open-air shelters are procured by Owner, installed by General Contractor Work on said project shall commence within ten (10) days of a written notice to proceed

Award

Playgrounds / Parks / Athletic Fields

$1,674,999.00

Public - City

New Construction, Paving, Site Work

37

14

12

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
95
Bidding Soon
1,075
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.