Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Bangor, Maine. Contact the soliciting agency for additional information.
The City of Bangor requests bids for the maintenance/rebuilding of portions of the Bangor International Airport's existing deicing stormwater treatment system. The City of Bangor requests bids for the maintenance/rebuilding of portions of the Bangor International Airport's existing deicing stormwater treatment system. Specifically, this project is associated with maintenance of Cell 4 and areas upstream of Cells 1-3 of the Airport's subsurface flow (SSF) gravel wetland system located southeast of the traffic circle on Godfrey Blvd. in Bangor and referenced in Attachment 1 (Phase IIIA-Disposal Area and Phase IIIB-Disposal Area Plans). The primary purpose of both phases of this project is to restore the original design and function of Cell 4 and the riprap-lined drainage channel located at the head of the International Canal. Any questions must be directed in writing to bids@bangormaine.gov no later than 4:30 P.M., Friday, September 15, 2023. The City reserves the right to award all, some, or none of the work detailed in this RFP. includes removing, disposing, and replacing portions of the cross-section of Cell 4, including the following items: a. Mobilization - Priced Per Lump Sum. b. Adequate erosion and sediment control measures to protect adjacent natural resources in accordance with all State and local regulations - Priced Per Lump Sum. c. Confirm the location of all existing utilities in the field - Priced Per Lump Sum. d. Dewatering and flow control, as needed - Priced Per Lump Sum. e. Remove and replace 1' thick SSF Filter Soil Media Layer and existing geotextile drainage fabric layer. Note: Geotextile layer will be replaced with a 1-inch-thick hay separation layer in lieu of geotextile drainage fabric - Priced Per Lump Sum. f. Remove and replace 2.5' SSF Wetland Gravel Media Layer, if deemed necessary following excavation due to sludge contamination - Priced Per Cubic Yard (CY): Approx. 780 CY. g. Replace geotextile separation fabric (Mirafi 500X or equivalent) located under SSF Gravel Media Layer, if damaged during construction - Priced per Square Yard (SY), Approx. 1,000 SY. h. Remove and replace Outlet Manifold (see Sheet C-501, G14, and D1), if deemed necessary following excavation, due to damage or clogging. This structure consists of approximately 24' of perforated 6" SDR-35, 24' of solid 6" SDR-35, 6 T fittings, 6 perforated end caps, 2 threaded end caps, and additional piping for cleanout repair, if necessary - Priced Lump Sum. Remove, clean, and re-install existing Isolator rows (See C-501, N14, and K1), including installation of non-woven geotextile drainage fabric (Mirafi 180N or equivalent) and woven geotextile separation fabric (Mirafi 500 X or equivalent) - Priced Per Lump Sum. j. Install appropriate stone access (Minimum of 5' wide, 6" D50 riprap, no steeper than 1:4 (with a flatter slope being preferred), or acceptable alternative approved by BGR) to both the inlet and outlet control structures for Cell #4, and all structures associated with Cells 1-3 (inlet, outlet, and intermediate structures). These access points will be used post-construction by BGR personnel during routine maintenance and inspection activities - Priced Per Lump Sum. k. Restore all vegetated areas disturbed during the project. - Priced Per Lump Sum. The City of Bangor reserves the right to reject any Proposals, waive any informalities or defects in Proposals, or accept a higher cost Proposal if it is deemed to be in the best interest of the City of Bangor. The City also reserves the right to negotiate with the successful Proposer.
Post-Bid
Transportation Terminals
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2023
October 27, 2023
Multiple Locations, Bangor, ME
Related To This Project
Bangor, ME
Bid Date: Oct 20 2023
Bangor, ME
Bid Date: Sep 27 2023
Bangor, ME
--
Bangor, ME
Bid Date: Apr 28 2021
Bangor, ME
Bid Date: Apr 21 2021
Bangor, ME
Bid Date: Dec 22 2021
Bangor, ME
Bid Date: Jan 28 2022
Bangor, ME
--
Bangor, ME
--
Bangor, ME
Bid Date: Sep 14 2023
Bangor, ME
Bid Date: Oct 02 2023
Bangor, ME
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.