BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Dyess AFB, Texas. Completed plans call for the renovation of a 6,000-square-foot military facility.

Project Title: BLDG 9001 Flooring 7 CONS is looking to procure construction services to perform flooring removal and flooring replacement for BLDG 9001. Please review all attachments for solicitation requirements: This is a total small business . SITE : an optional site is scheduled for 0900 CST 8 Sept 23. Vendors wanting to attend the site must RSVP by 1400 CST 7 Sept 23. To RSVP please tate.elie. 1@us.af.mil and brandon.gilbert.9@us.af.mil REQUIRMENTS: Interested vendors must submit a capability statement, material list including pictures, and flooring phasing plan in order to determine technical acceptability. DUE : Interested vendors must submit by 2:00PM CST 15 Sept 23 to tate.elie.1@us.af.mil and brandon.gilbert.9@us.af.mil EVALUATION OF OFFERS: The evaluation for this acquisition will be solely based on lowest price of items that are found to be technically acceptable. By signing its offer, the offeror certifies that each price stated on each CLIN includes an appropriate apportionment of all costs, direct and indirect, all state and local taxes, overhead, and profit. In accordance with FAR 36.204 Disclosure of of construction projects: Between $100,000 and $250,000 Funds are not presently for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document. Based offthe Statement of Work and materials needed for the proposed task, CES estimates approximately 180 days to complete desired project. complete it within 60 calendar days

Post-Bid

Military

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
144
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

October 24, 2023

img_map_placeholder

To Be Determined, Dyess AFB, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.