Site work and paving for a mixed-use development in Woodstock, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of November 14 ,2023 project was awarded to Summit Construction, awarded amount is $3,689,803.29** Payment will be made to the Contractor each calendar month based on the estimated work completed and in place as described by the standard specifications. Final payment of amounts withheld or deposited in escrow will not be made until the City of Woodstock, Georgia has certified that the work has been satisfactorily completed and accepted.The City of Woodstock, Georgia reserves the right to reject any one or all bids and to waive formalities. All bidders shall be prequalified with the Georgia Department of Transportation prior to submission of the bid. A required performance bond is to be 100% of the contract amount and a required payment bond is to be 110% of the contract amount. Deadline for questions will be Friday, September 29th , at 5 pm. Responses to questions will be provided by Wednesday, October 4th, at 5:00 pm. The contract timeframe is 456 calendar days. A 5% bid bond (or certified check in lieu of bond) For all questions about this RFP contact: Martyn Detz 770-592-6000 Ext 1205 hWsiZ/yfap^.yendorreQisiryxom/Bjds/yjew/BjdsListîEkjyeddj^ScSbllS-gedS-^Haa-Q^Q-- e69c2b290b8a The work to be done consists of the furnishing of all materials, labor, and equipment for the complete construction of the Neese Rd Improvements Southern Segment, hereinafter referred to as the "PROJECT", including, but not limited to, erosion control, maintenance of traffic, paving, grading, excavation, subgrade preparation, drainage construction, wall construction, concrete surface course, sidewalks, signs, pavement marking, and grassing at locations indicated in the plan set. The contract timeframe is 456 calendar days. This item shall consist of miscellaneous work to be accomplished at the direction of the Engineer. It shall include items of work consistent with and related to the project which are not shown on the plans, but which may be necessary to the successful completion of the contract. It is expected that work under this item will be accomplished utilizing construction items established under the other sections of these specifications.

Award

Roads / Highways

$3,689,803.00

Public - City

Paving, Site Work

286

13

4

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
60
Bidding Soon
1,538
All Active Projects
576
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2023

December 13, 2023

img_map_placeholder

Neese Rd, Woodstock, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.