Site work for a water / sewer project in Horsham, Pennsylvania. Completed plans call for site work for a water / sewer project.
The work to be done under this contract consists of all labor, equipment and materials to Drill one 12-inch diameter test well and perform 72-hour pumping test as described elsewhere in the Project Manual. Work is contained under a unit price contract. AVAILABLE DATE 9/7/2023 10:30 AM Question Deadline 10/04/2023 at 5:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer by clicking on the Questions tab within PennBid. A. Well Drilling: 1. Enlarge one (1) test well drilled with an air-rotary drill rig to a depth of 605 feet. The test well is located in the Stockton Formation (sandstone/shale) in Horsham Township. 2. CONTRACTOR shall remove approximately 60 feet of the previously installed 6-inch casing and bentonite from test borehole and dispose of properly. 3. CONTRACTOR shall ream the borehole from the existing 6-inch diameter to 20 inches in diameter, to a depth of 15 feet. 4. CONTRACTOR shall install 0.375-inch thick, 16-inch diameter steel well casing to depth of 15 feet at top of bedrock within the 20-inch diameter borehole. 5. CONTRACTOR shall ream the borehole from the existing 6-inch diameter to 16 inches in diameter, from the 15-foot depth down to a 60 foot depth. 6. CONTRACTOR shall install 0.330-inch thick, 12-inch diameter steel well casing from 18 inches above ground surface to a depth of 60 feet within the 16-inch diameter borehole. CONTRACTOR shall weld all sections of pipe. 7. CONTRACTOR shall install a drive shoe at the bottom of the 12-inch diameter casing. 8. CONTRACTOR shall install grout in the annular space between each steel well casing and well hole with Portland cement grout. The grouting shall be performed with the use of a Tremie pipe starting from the bottom of the steel casing and continuing to the ground surface. 9. CONTRACTOR shall continue to ream borehole to a diameter of 12 inches below the casing to a depth of 605 feet. 10. CONTRACTOR shall develop each water-producing zone encountered, by surging with compressed air, to clear the zone of sediment and maximize yield. CONTRACTOR shall estimate the well yield at each water-producing zone through visual or quantitative means, depending on flow conditions. 11. CONTRACTOR shall develop test well at the completion of drilling until the water is substantially free of sediment and as directed by ENGINEER. 12. CONTRACTOR shall provide locking sanitary well cap for test well. 13. CONTRACTOR shall install one (1) 15-foot-deep piezometer. The piezometer shall be installed in a 6-inch diameter boring and constructed with 10 feet of 2-inch diameter screened PVC and 7 feet of solid 2-inch diameter PVC including 2-foot stickup. Clean sand shall be installed from depth of 3 feet to 15 feet. A 5-foot section of 4-inch diameter well casing shall be installed from 2 feet above the ground surface to depth of 3 feet below ground surface. 14. CONTRACTOR shall implement erosion and sediment control measures according to PADEP protocol for handling of discharge water during drilling and pumping test. Erosion and sediment control measures shall include, if necessary, excavation of a temporary sump for drilling water and filter bag for discharge of water. B. Pump Testing: 1. CONTRACTOR shall install test pump in one (1) well. Pump shall be installed to depth of 200 feet and shall be capable of pumping 300 gpm with head of 186 feet of water above pump and discharging to ground surface. 2. CONTRACTOR shall install two (2) 190-foot long 3/4"-diameter pipes in the test well for water level monitoring purposes. 3. CONTRACTOR shall provide generator, pressure gauge, ball valve, flow meter, and a sample port at the well head for sampling during the pump test. 4. CONTRACTOR shall provide 200 feet of discharge line and BMP's for E&S Controls. 5. CONTRACTOR shall operate pumping equipment during one (1) 4-hour stepdrawdown test with constant pumping rates of 150, 200, 250, and 300 gallons per minute or as directed by ENGINEER. CONTRACTOR shall remain onsite during stepdrawdown test. 6. CONTRACTOR shall operate pumping equipment during one (1) 72-hour aquifer pumping test at a constant rate of 300 gallons per minute or as directed by ENGINEER. CONTRACTOR shall remain onsite during pumping test. 7. After completion of pumping test, contractor shall disinfect well with sodium hypochlorite according to American Water Works Association (AWWA) standard C654.
Award
Water / Sewer
$82,563.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2023
October 23, 2023
515 Norristown Rd, Horsham, PA
Related To This Project
Horsham, PA
Bid Date: Oct 12 2021
Horsham, PA
Bid Date: Oct 27 2021
Horsham, PA
Bid Date: Mar 02 2022
Horsham, PA
Bid Date: Jul 12 2019
Horsham, PA
Bid Date: Mar 24 2022
Horsham, PA
Bid Date: Oct 20 2023
Horsham, PA
--
Horsham, PA
Bid Date: Dec 14 2023
Horsham, PA
Bid Date: Sep 08 2023
Horsham, PA
Bid Date: Sep 13 2023
Horsham, PA
Bid Date: Oct 21 2020
Horsham, PA
Bid Date: Aug 18 2023
Horsham, PA
Bid Date: Jul 19 2023
Horsham, PA
Bid Date: Dec 19 2023
Horsham, PA
Bid Date: Apr 01 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.