BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in St George, Utah. Completed plans call for site work for a educational facility; and for the construction of a educational facility.

Reference Number 0000329743 The purpose of this RFP is to solicit competitive proposals from qualified firms for a Construction Manager (at risk)/General Contractor (CM/GC). Firms must be licensed and certified as applicable in the State of Utah, to construct a new Snow Canyon Middle School per design from NWLA Architects. The CM/GC will work closely with the Washington County School District Facilities Director and NWLA Architects, through the design phase, providing cost estimates, schedules and feedback of design details, phasing, and availability of materials selected. CM/GC will also monitor the bid climate and recommend the optimal bidding schedule to the design team. The Washington County School District intends to construct a new replacement school at Snow Canyon Middle School. The anticipated square footage will be approximately 166,ooo sf. It is anticipated that the project will begin construction approximately March of 2024 with anticipated occupancy in August 2026. Site plans, floor plans and exterior elevations will be available at the mandatory pre-bid conference. See Item J above. Question Acceptance Deadline 09/28/2023 2:00 PM MDT Questions are submitted online Yes All inquiries and questions related to this Request for Proposal must be submitted on the original posting on the Bidnet website. Phone calls and emails will be referred to the original posting. Fixed Limit of Construction Costs The Fixed Limit of Construction Costs (FLCC) for this project is currently $66,400,000. ($400 psf) Offering Contractors will be required to provide evidence of 100% payment and performance bonds for the Fixed Limit of Construction Cost (FLCC) with their proposal. *Washington County School District reserves the right to accept or reject any or all proposals and to waive any formality, informality, irregularity, or technicality in any proposal. The District also reserves the right to call for new bids if their interests or convenience is better served by such course. The Washington County School District intends to construct a new replacement school at Snow Canyon Middle School. The anticipated square footage will be approximately 166,ooo sf. It is anticipated that the project will begin construction approximately March of 2024 with anticipated occupancy in August 2026. Site plans, floor plans and exterior elevations will be available at the mandatory pre-bid conference. See Item J above.

Post-Bid

Educational

$66,400,000.00

Public - County

New Construction, Site Work

1

3

13

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
134
All Active Projects
54
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 3, 2023

March 4, 2024

August 31, 2026

img_map_placeholder

811 E Brigham Rd, St George, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.