Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Boulder, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000329813 Question Acceptance Deadline 10/04/2023 at 4:00 PM MT Overview - be sure to review project requirements for both project sites (1 - Eagle and Sage Trails; and 2 - Kelso Road) in the contract documents. a) Eagle and Sage Trails: i) Description: Gravel-surfaced roads. ii) Primary purposes: (1) Recreational trail use by hikers, runners, bicyclists, and equestrians (horseback riders). (2) Road/vehicle access for agricultural operations, OSMP administrative operations, and emergency access. Public motorized vehicle use is prohibited - a gate blocks the road entrance. b) Kelso Road: i) Description: Simple two-track unimproved road. ii) Primary purpose: OSMP administrative vehicle access route. It is occasionally used recreationally by walkers, but this is not an official designated use of the road. Public motorized vehicle use is prohibited - a gate blocks the road entrance. 2) Description of Work: a) Eagle and Sage Trails: Implement repairs of the roads to improve conditions according to the provided Plans and Specifications. The goals are to: i) Repair erosion and mud issues. ii) Improve drainage to prevent future deterioration of the road. iii) Improve recreational experiences for trail users. b) Kelso Road: Repair the sinkhole that has formed on an embankment - review the enclosed "Kelso Road Sinkhole Repair" documents for details. There are not engineered plans for this work - OSMP looks to the Contractor to recommend best practices and options for repairing this site. 3) Timeline: a) Construction work may be started afterall of the following: i) Tuesday, January 16, 2024 ii) Issuance of the Contract Notice to Proceed to the Contractor iii) Contractor notification to OSMP a minimum of 2 weeks prior to construction to ensure that OSMP has adequate to implement trail/trailhead closures and provide public notification. b) March 15, 2024: i) Substantial Completion of Eagle and Sage Trails Phase 1 construction. c) May 6, 2024: i) Substantial Completion of Eagle and Sage Trails Phase 2 construction. ii) Substantial Completion of Kelso Road sinkhole repair. d) May 15, 2024: i) Final Completion. The City of Boulder is requesting bids from qualified contractors to repair two project sites: Eagle and Sage Trails (which serve as recreational trails and administrative and agricultural access roads) and Kelso Road (a simple two-track access road). The work shall be implemented according to the project plans and contract documents. The proposal guaranty shall be a certified check, cashier's check, or bid bond in the amount of 5 percent of the Contractors total bid. The City of Boulder reserves the right to make the award on the basis of the bid deemed most favorable to the City, to waive any informalities or to reject any or all bids. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required
Bid Results
Roads / Highways
$560,927.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2023
January 16, 2024
Multiple Locations, Boulder, CO
Related To This Project
Boulder, CO
Bid Date: Oct 18 2018
Boulder, CO
Bid Date: Jan 13 2022
Boulder, CO
Bid Date: Jan 12 2022
Boulder, CO
Bid Date: Jan 07 2022
Boulder, CO
Bid Date: Jan 06 2022
Boulder, CO
Bid Date: Jan 06 2022
Boulder, CO
Bid Date: Jan 04 2022
Boulder, CO
Bid Date: Nov 09 2023
Boulder, CO
Bid Date: Sep 14 2023
Boulder, CO
Bid Date: Sep 22 2023
Boulder, CO
Bid Date: Sep 29 2023
Boulder, CO
--
Boulder, CO
Bid Date: Sep 20 2023
Boulder, CO
Bid Date: Sep 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.