BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Evansville, Indiana. Completed plans call for site work for a water / sewer project.

Sealed proposals will be received by the Evansville Water and Sewer Utility, Evansville, Indiana at the Sunrise Pump Station, located at 1200 Waterworks Road, Evansville, Indiana 47708 and Bids will be publicly opened and read aloud, Bids are to be placed in a drop box that is located outside of room 100 at the EWSU offices located at 1 NW Martin Luther King, Jr. Boulevard until approximately 2:20 p.m. local time. (If drop box is locked, approximately 40 minutes prior to the scheduled meeting, the bid will only be accepted by an EWSU staff member in the scheduled meeting room prior to the scheduled meeting time.) This shall include all the necessary work associated with C.I.P.P. lining, including but not limited to bypass pumps and bypass pumping. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. Email questions regarding virtual access to eplans@ewsu.com The Bee Slough Sewer Rehabilitation project consists of the C.I.P.P. lining of approximately 465 linear feet of 60" diameter sewer main. This project also includes an Alternative Bid that consists of the C.I.P.P. lining of approximately 660 linear feet of 60" diameter sewer main. This shall include all the necessary work associated with C.I.P.P. lining, including but not limited to bypass pumps and bypass pumping Methods to be used are CIPP for Mainline Renewal and other miscellaneous rehabilitation items as specified. The Contractor shall be responsible for all work described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. Question Deadline 09/26/2023

Award

Water / Sewer

$1,049,385.00

Public - City

Site Work

4

24

6

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
26
Bidding Soon
360
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

December 4, 2023

img_map_placeholder

1200 Waterworks Rd, Evansville, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.