BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in San Francisco, California. Completed plans call for the construction of a 42,000-square-foot, three-story above grade water / sewer project; and for site work for a water / sewer project.

Due to security reasons only project details are available. In order to obtain documents for this please reach out to the owner directly QBD@sfwater.org. San Francisco Public Utilities Commission ("SFPUC") announces a Request for Qualifications and Proposals ("RFQ&P") inviting California Class "B" General Building Contractors to submit their qualifications for evaluation and submit a Proposal simultaneously in response to this RFQ&P to perform pre-construction and construction services for Contract No. WW-750 -Southeast Water Pollution Control Plant SEP-7 Operations, Engineering, and Maintenance Buildings ("SEP-7" or "Project"), using the Construction Manager / General Contractor project delivery method. Interested parties responding to this RFQ&P ("Applicants" or "Proposers") must be construction manager / general contractors ("CM/GCs") capable of performing preconstruction services and building construction services. Work shall comply with all applicable codes and regulatory agencies' standards having jurisdiction over the design, construction and operation of the Project. The Project, located at 1700 Jerrold Avenue, a property just under an acre, located at Jerrold Avenue and Phelps Street, will replace an existing facility (SEP 850) with two new buildings, Maintenance Mechanical (SEP 603) and Operations, Engineering and Maintenance (SEP 914). The work includes relocation of SEP 850 staff, facilities and utilities; demolition of the SEP 850 building, two existing trailers (SEP 850A and 850B) and an adjacent surface parking lot; and construction of the new buildings. The new buildings will provide shops for maintenance groups, offices for the engineering division and shower and locker facilities for the Plant. The Maintenance Mechanical building (SEP 603) will be one-story with a mezzanine, 35 feet high, and approximately 10,000 square feet of industrial shops space for SEP maintenance crews. The Operations, Engineering and Maintenance (SEP 914) will be three-stories, 50 feet high, and approximately 42,000 square feet. The building would consist of a lobby, breakroom, industrial shops for Painters, Carpenters, and Plumbers on the first floor, shower and locker facilities and meeting space on the second floor, and offices for Engineering staff on the third floor. Construction of the new buildings would require temporary relocation of existing equipment and occupants in and adjacent to SEP 850. This incudes engineering staff on the third floor, showers and lockers on the second floor, and HVAC equipment that connects to SEP 930 located on the ground floor. The following is the proposed plan for each: a. Engineering staff - Temporary relocation to trailers used for Headworks, located on Phelps. b. Showers & Lockers - New shower trailers would need to be sourced for staff use throughout the life of the project. These trailers will require power, water, and sewer connections. c. Boiler & HVAC - The existing boiler and air conditioning equipment in SEP 850 provides service to neighboring building SEP 930. A temporary plant will need to constructed to house this equipment during construction. This plant will need to function before the utilities are decommissioned at SEP 850. Written questions regarding the RFQ&P shall be directed to September 29, 2023.

Post-Bid

Water / Sewer

$75,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
172
Bidding Soon
3,311
All Active Projects
1,348
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 18, 2023

February 14, 2025

December 3, 2027

img_map_placeholder

1700 Jerrold Ave, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.