Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Norwood, Massachusetts. Contact the soliciting agency for additional information.
The primary voltage of the transformer will be 13800 GRDY / 7970 volts. Requested secondary voltage, KVA and quantities Transformers are for both loop and radial operation. The primary shall consist of three individual coils connected in WYE and the secondary shall consist of three individual coils connected in WYE. These coils shall be wound on a five-legged or equivalent core design to eliminate unbalanced and ferroresonant conditions The live front, high voltage termination shall be externally clamped, porcelain bushings, with clamp type connectors or blade terminal as required for vertical take-off. The dead front, high voltage termination shall be externally clamped, universal type bushing wells or internal bushings Transformer shall be furnished with (4) 2½% full capacity taps, two above and two below the nominal voltage, controlled by a no-load externally operated tap changer, the handle of which shall be located in the high voltage compartment. The Town of Norwood reserves the right to increase or decrease the quantity of items ordered, whichever is in the best interest of the Town. The Town of Norwood is under no obligation to purchase this transformer. Bidders shall make themselves aware of the provisions of Massachusetts General Law, Chapter 149, Section 26 to 27F before filing a sealed BID with the Town. This law refers to the prevailing wage rate minimums as set forth by the Massachusetts Department of Labor and Industries, 100 Cambridge Street, Boston, MA 02202. BID BONDS OR SURETY (Not Required) Pursuant to the terms, conditions, and final agreement executed, the contractor shall present to the Town within ten (10) days of notification of contract award a performance surety and a payment surety in an amount equal to fifty percent (50%) of the Contract Award amount. The bond or surety shall remain in force throughout the guaranty period, warranty period, or period so specified by the Town, for all projects, products, materials, supplies, equipment, apparatus or other designated bid items. The Town of Norwood hereby notifies all Bidders that minority business enterprises will be afforded full opportunity to submit bids in response to the Advertisement to Bid and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. The sum of Five Hundred Dollars ($500) per cancellation is to be agreed upon as liquidated damages, and shall be paid by the Contractor to the Owner for each non- Norwood weather cancellation. If the contractor fails to report as scheduled for reasoning other than inclement weather forecasted in Norwood, the Town may elect to impose liquidated damages. Reductions for liquidated damages shall be made from payments due the Contractor. All questions must be submitted in writing to jadams@norwoodma.gov. Questions will be accepted until September 26, 2023 at 11:00 A.M. Contract Value: 700,000.00
Post-Bid
Roads / Highways
$700,000.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2023
December 11, 2023
Multiple Locations, Norwood, MA
Related To This Project
Norwood, MA
Bid Date: Nov 15 2021
Norwood, MA
Bid Date: Dec 09 2021
Norwood, MA
Bid Date: Jun 10 2021
Norwood, MA
Bid Date: Apr 09 2021
Norwood, MA
Bid Date: Jun 25 2021
Norwood, MA
Bid Date: May 04 2021
Norwood, MA
Bid Date: Mar 01 2022
Norwood, MA
Bid Date: Feb 25 2022
Norwood, MA
Bid Date: Sep 27 2023
Norwood, MA
Bid Date: Sep 26 2023
Norwood, MA
Bid Date: Oct 04 2023
Norwood, MA
Bid Date: Aug 10 2023
Norwood, MA
Bid Date: Aug 17 2023
Norwood, MA
Bid Date: Aug 10 2023
Norwood, MA
Bid Date: Jul 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.