BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2023 at 8:00 PM

Updated November 15, 2023

Renovation of a military facility in Powderly, Texas. Completed plans call for the renovation of a military facility.

Electrical Upgrades are needed to Buildings 135 and 136 at Camp Maxey in Powderly, Texas. Camp Maxey, Building 135 A) Remove existing distribution panel, provide and install one (1) new, 42 hole, 225 amp Distribution Panel located in Room 8 (eight). Note: Existing electrical service will be from Main Panel B) Evenly distribute and install one (1), 4-recepticle electrical outlet between every other two-man bunk on the North, East, South, and West Wall, along the entire length of each wall as well as mounted on the support columns in the center of the building. B.1) Power will be fed through Metal Clad Cable (MC Cable) in the crawl space, Electric Metallic Tube conduit to be used and standard wire where exposed. C) Provide and Replace up to eighty (80) light fixtures located in the Billets and Dining Facility (DFAC). C.1) Light Fixtures must have the ability to hold up to two (2), four (4) foot, 10-15 Watt LED Light Bulbs. D) Install two (2) new receptable circuits in the Kitchen area and add four (4), 4- receptacle electrical outlets. E) Install two (2) new receptable circuits in the Serving area and add four (4), 4- receptacle electrical outlets. F) Install one (1) dedicated receptacle outside of the Kitchen in the Loading Dock area And add one (1), 4-recepticle electrical outlet. G) Provide and replace four (4) exterior lighting wall packs with new LED Models G.1) Two (2) Packs on West side of the building. G.2) Two (2) Packs on East side of the building. C.2.3 - Camp Maxey, Building 136 A) Remove existing distribution panel, provide and install one (1) new, 42 hole, 225 amp Distribution Panel. Note: A new dedicated 225 amp service will need to be added from main panel to this new distribution panel. B) Evenly distribute and install one (1), 4-recepticle electrical outlets between every other two-man bunk on the North, East, South, and West Wall, along the entire length of each wall as well as mounted on the support columns in the center of the building. B.1) Power will be fed through Metal Clad Cable (MC Cable) in the crawl space, Electric Metallic Tube conduit to be used and standard wire where exposed. C) Provide and Replace up to eighty (80) light fixtures located in the Billets and Dining Facility (DFAC) C.1) Light Fixtures must have the ability to hold up to two (2), four (4) foot, 10-15 Watt LED Light Bulbs. D) Provide and replace four (4) exterior lighting wall packs with new LED Models D.1) Two (2) Packs on West side of the building D.2) Two (2) Packs on East side of the building 09/04/2023 5:00pm US Central Time Last day to submit written questions for clarification to TMD

Award

Military

$190,800.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
15
Bidding Soon
1,485
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

October 13, 2023

Project location map

6351 US-271, Powderly, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.