BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2024 at 8:00 PM

Updated March 24, 2024

Site work and paving for a mixed-use development in San Bernardino, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

CHINO/MONTCLAIR ADA RAMPS LENGTH: Various AREA: Chino/Montclair ROAD NO.: "COUNTY: 124225010 137150010 223850010 251000010 263100010 292100010 346050030 375075010 389200010 39507501 426750020 471000010 476750010 493310030 529825020 562350010 807500010 847200010 876375010 CITY OF MONTCLAIR: ADA AVE. STATE ST. CLIFFWOOD DR. COLLEGE AVE. HOWARD ST. STAGECOACH AVE" The work, in general, consists of sawcut and remove existing asphalt concrete; sawcut and remove existing minor concrete; milling; overlay; grading and placing asphalt concrete surfacing; construct curb and gutter; construct spandrel and/or cross gutter; construct ADA ramp; place detectable warning surface; construct concrete sidewalk; construct retaining curb; construct grouted rock; reset roadside sign; adjust to grade existing water valve; paint traffic stripe and pavement markings; construct hydrant pad; paint red curb and doing other work appurtenant thereto. The bids must also be accompanied by cash, cashier's check, certified check, or bidder's bond executed by an admitted surety insurer, made payable to the San Bernardino County in the amount of at least ten percent of the amount of the bid given as a guarantee that the bidder will enter into a contract. The contract shall be signed by the successful bidder and returned within 10 days, and the contract bonds, copy of insurance policies, and Certificates of Insurance, with documents to verify any self-insurance coverage shall be provided within 10 days, not including Saturdays, Sundays, and legal holidays, after the bidder has received the contract for execution. BONDS: The successful bidder will be required to furnish a Labor and Materials Bond and a Faithful Performance Bond, each in a penal sum equal to one hundred percent of the contract price. Question Deadline 01/12/2024 at 4:00 PM PT QUESTIONS: Bidders must submit all questions in writing, by mail, fax, or e-mail. The Engineer will issue two (2) Notices to Proceed, the first being a Notice to Proceed with Submittals, and the second being a Notice to Proceed with Construction. The Contractor shall begin construction work within 15 days after the Notice to Proceed with Construction (excluding Saturday, Sunday, and holidays). Pursuant to Section 1-1.07, "DEFINITIONS", of the Caltrans Standard pecifications, "day" means "24 consecutive hours running from midnight to midnight; calendar day". This project requires a Class A or C08 contractor's license issued by the California Contractors State Licensing Board. The Contractor must maintain this license from contract award through contract acceptance. All contractors, including any out-of-state contractors/subcontractors, must comply with all applicable laws and regulations of the State of California at the time of bid and award.

Bid Results

Sidewalks / Parking Lot

$819,705.00

Public - County

Paving, Site Work

14

7

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
629
Active Projects
300
Bidding Soon
3,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

February 26, 2024

Project location map

Multiple Locations, San Bernardino, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.