BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2024 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

The University of Alberta (U of A) owns, operates and maintains an extensive District Energy System (DES) that includes a Heating Plant (HP), two Cooling Plants (CP), over 10 km of underground services corridor and an electrical utility system. The electrical utility utilizes two 15kV substations, 22 sectionalizers, and nearly 80 km of cabling to distribute power imported on six dedicated feeders from EPCOR, as well as power generated on site from two natural gas fired Steam Turbine Generators (STG1 and STG2). The U of A electrical utility system provides power to the Walter C. Mackenzie Hospital, the Cross Cancer institute, the Blood Bank and all U of A buildings. The Electrical Utilities group for the University of Alberta is replacing 41 protective relays associated with its two 15kV Substations (the Norths Switching Station (NSS) and the South Switching Station (SSS). TIMELINE: The University of Alberta Utilities department is seeking a qualified and experienced Engineering Consultant to participate in the design, sizing, selecting, programing and installation of new GE Multilin 8 series protective relays, GE Multilin G500 and all associated connections to make fully functional. These relays and associated G500 are for the two 15kV substations, the NSS and SSS. These two substations supply power to ALL buildings, plants and medical facilities in the DES system on North Campus. The G500 has been received and all remaining relays are expected to be delivered in mid August. There is a significant upgrade underway for the electrical power system for both U of A electrical Utilities facilities as well as EPCOR Garneau substation that is creating schedule requirements. The Consultant is advised that the Electrical Utility System MUST remain operational during the design and the installation process. The method of Contractor Selection has not been Determined at this time.

Award

Power Plant

$287,583.00

Public - State/Provincial

Renovation, Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
21
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2024

Project location map

To Be Determined, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.