BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Effingham, Illinois. Working plans call for the renovation of a water / sewer project.

As of 10/23/2023, all bids have been rejected. A timeline for the rebid of this project is not available. The proposed work is officially known as Water Treatment Plant OHD Improvements for the City of Effingham, Illinois. The project shall consist of the installation of the removal of glass windows and the installation of a new overhead door along with other miscellaneous reconstruction related work. Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by a bid bond, bank cashiers check, bank draft or certified check for not less than five (5) percent of the amount of the bid. A surety bond for the full amount of the award is required. Failure on the part of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. It is agreed that this bid may not be withdrawn for a period of 45 days from opening thereof or it will be subject to forfeit the 5% Bid Bond provided with the bid It is anticipated that a Notice of Award of a contract will be issued within 30-to-45 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Contractor shall not pay less than the prevailing wage to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820ILCS 130/1-12). Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted by P.A. 95-0635. bonding in a timely manner.

Final Planning

Water / Sewer

$89,975.00

Public - City

Renovation

4

5

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
43
Bidding Soon
415
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

January 8, 2024

img_map_placeholder

1910 W Nat'l Ave, Effingham, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.