BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fort Worth, Texas. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

General Description of Work The Major Work Will Consist of the (Approximate) Following: Construct a Twelve (12) Foot Wide Trail With Two (02) Foot Wide Shoulders From the Intersection of Trinity Boulevard/skyview Drive To the Tre Centreport Rail Station. Project to Includes Approximately 10,500 Sy of 5 Sidewalk Pavement, 3,125 Cy of Embankment, 6,045 Cy of Excavation, Seven (07) Cast-in-place Retaining Walls Totaling 5,873 Sf of Wall Face, and Two (02) Drill Shaft Retaining Walls Requiring Approximately 4,530 Lf of Drill Shaft (36-48 Diameter) and Totaling 3,697 Sf of Wall Facia, 718 Lf of Cast-in-place 54-inch Tall Single Slope Concrete Traffic Barrier, and One (01) 100-foot Span Pedestrian Bridge Including Drill Shafts and Substructure. Project Will Also Include Removals, Small Drainage Structures, Signage, Striping and Erosion Control. Texas Department of Transportation (Txdot) Prequalification. Texas Department of Transportation (Txdot) Certification of Dbe Goal The Goal for Disadvantaged Business Enterprises is Established: Dbe (7% Race-conscious) Document Examination and Procurements. City Reserves the Right to Waive Irregularities and to Accept or Reject Any or All Bids. All inquiries relative to this procurement should be addressed to the following: Attn: David Munoz, Park Planner, City of Fort Worth Email:David.Munoz@fortworthtexas.gov Phone: 817.392.5744 Attn: Jing Yang, RLA, AICP, City of Fort Worth Email:Jing.Yang@fortworthtexas.gov Phone: 817.392.5742 AND/OR Attn: Jordan Viggiano, PE, Halff Associates Email: jViggiano@Halff.com Phone: 214.217.6513

Post-Bid

Roads / Highways

$7,077,604.00

Public - City

Paving, Site Work

268

20

12

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
62
Bidding Soon
3,510
All Active Projects
1,391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.