Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 23, 2024 at 7:00 PM
Updated December 13, 2024
Site work for a water / sewer project in Springfield, Illinois. Completed plans call for site work for a water / sewer project.
The scope of work remains the same and provides for repairs to the ponds at the IDNR Brunsvold Building including: making repairs to the 42 in. concrete overflow and outlet pipes in the vicinity of the outlet structure, re-grading pond base around outlet structure, installing new rubber membrane pond liner in vicinity of outlet structure, replacing sluice gate at outlet structure and installing rock protection around the outfall structure. Project also includes repairing visible patches in pond liner throughout both the east and west ponds, repairing embankment at a depression of the pond liner on the east side of building between wall pier and south side of the 4 ft x 4 ft box culvert (limited removal and replacement of the pond liner at this localized embankment repair. The scope of work provides for repairs to the ponds at the IDNR Brunsvold Building including: making repairs to the 42 in. concrete overflow and outlet pipes in the vicinity of the outlet structure, re-grading pond base around outlet structure, installing new rubber membrane pond liner in vicinity of outlet structure, replacing sluice gate at outlet structure and installing rock protection around the outfall structure. Project also includes repairing visible patches in pond liner throughout both the east and west ponds, repairing embankment at a depression of the pond liner on the east side of building between wall pier and south side of the 4 ft x 4 ft box culvert (limited removal and replacement of the pond liner at this localized embankment repair. Incorporated documents include the March 2009 Standard Documents for Construction & Supplement , quote submitted by E.L. Pruitt Company dated June 16, 2023, and design documents provided by the Architect/Engineer of record. Section 01 29 00 PAYMENT PROCEDURES, will be strictly followed and adhered to. The sum of all items listed in the Contractor Schedule of Values should equal the contract award amount. Payment amounts will be approved based on proof of work actually performed and materials actually used. Construction Services provided under this procurement should not exceed $130,081.00, which is a place-holder prior to entering into a Construction Contract, without prior authorization from the Capital Development Board in consultation with the Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out. In accordance with section 00 21 50 of the Standard Documents for Construction, the General Contractor shall perform no less than 20% of work with its own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.
Award
Water / Sewer
$130,081.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2023
October 18, 2023
To Be Determined, Springfield, IL
Related To This Project
Springfield, IL
Bid Date: Sep 13 2022
Springfield, IL
--
Springfield, IL
Bid Date: Jul 28 2021
Springfield, IL
Bid Date: Sep 01 2022
Springfield, IL
Bid Date: Aug 11 2022
Springfield, IL
--
Springfield, IL
Bid Date: Sep 26 2023
Springfield, IL
Bid Date: Oct 12 2023
Springfield, IL
Bid Date: Jun 16 2022
Springfield, IL
Bid Date: Jul 07 2022
Springfield, IL
Bid Date: Jun 17 2022
Springfield, IL
Bid Date: Jun 17 2022
Springfield, IL
Bid Date: Apr 29 2022
Springfield, IL
Bid Date: Jun 24 2022
Springfield, IL
Bid Date: Jun 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
