EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 3, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Algonquin, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Towne Park Crystal Creek Water Main Crossing Project. All bid proposals must be accompanied by a bid bond, certified check, or bank cashier's check payable to the Village of Algonquin for 5% of the amount of the base bid as provided in the Bidding Documents. No proposals or bids will be considered unless accompanied by such bond or check. If mailing is requested an additional $5.00 deposit will be required. Bid Security: All bid proposals must be accompanied by a bid bond, certified check, or bank cashier's check payable to the Village of Algonquin for 5% of the amount of the base bid as provided in the Bidding Documents The Village of Algonquin reserves the right to accept the bid deemed to be in its own best interest, which is based on all of the above considerations. Bid will ultimately be awarded to a responsible bidder determined in the discretion of the Village Board of Trustees. Description of Work: The Work is called Towne Park/Crystal Creek Water Main Crossing Project and shall consist of the open cut construction of a 16" PVC water main below Crystal Creek, within Towne Park in the Village of Algonquin. The project will also include minor curb and gutter replacement, sidewalk replacement, riprap replacement, bituminous bike path replacement, split rail fence installation, and native wetland seeding. Available Contract Documents The Village of Algonquin reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the Village. Public Works

Bid Results

Sidewalks / Parking Lot

$525,280.00

Public - City

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
213
Bidding Soon
2,676
All Active Projects
1,293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

November 1, 2023

img_map_placeholder

Multiple Locations, Algonquin, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Towne Park/Crystal Creek Water Main Crossing Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.