BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Carson City, Nevada. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of September 20, 2024, an engineer has been selected nd this project is in the design development phase. Construction is not expected to start until 2026. *The closed solicitation has been included below for reference: The project includes design of transit, trail, and parking improvements at Chimney Beach (~130 spaces) and Secret Harbor (~120 spaces). Chimney Beach includes a pedestrian actuated signalized crossing on SR 28, .9 miles of trail, a prefabricated bridge at Marlette Creek, and vista points. Transit pullouts at Thunderbird Lodge, Chimney Beach, and Secret Harbor. Signage extension of the No Parking Zone from just north of the IVGID pump station to the chain control sign/pullout south of Secret Harbor is included. NEPA is complete. Construction to begin in 2026 Any questions raised by Proposers must be submitted via email to jallen@tahoetransportation.org no later than 3:00 p.m. PST, on October 5, 2023. Only questions or requests submitted by the deadline will be considered. No requests for additional information or clarification to any other TTD office, consultant, employee, or the Federal Highway Administration (FHWA) will be considered. Responses to questions regarding the RFP, including requests for clarification and requests to correct errors, will be posted on TTD's website on or before October 12, 2023. DBE Goal: 6.0% (5 points): Submittal of completed Attachment C - DBE Commitment to Subcontractors, DBE Certificates, and DBE Commitment Letters per Section VII will satisfy a response to this Evaluation Factor, and will not count towards the maximum allowable pages. Phase 1 Work (30% design & environmental analysis) December 15, 2023 May 1, 2024 Phase 2 Work (60% design) April 1, 2024 July 31, 2024 Phase 3 Work (final design) June 30, 2024 September 30, 2024

Design

Sidewalks / Parking Lot

$16,864,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
15
Bidding Soon
227
All Active Projects
95
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

img_map_placeholder

NV-28, Carson City, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.