BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Plano, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.bizjournals.com/dallas/news/2024/04/09/costco-prosper-construction.html Significant infrastructure and road projects are underway are upcoming to improve connectivity in the region, including the six-mile extension of the Dallas North Tollway from U.S. 380 to FM 428. "We are hoping TxDOT will complete the 380 expansion in that area in the very near future as it is critical to our growth, traffic flow and accessibility to area development," Moon said in a statement. _____________________________________________________________________________________________________________________________________________________ https://www.bizjournals.com/dallas/news/2024/03/27/anna-housing-growth-explained.html Furthermore, state and local agencies have committed to upgrading infrastructure in northern Collin County. The 55-mile Collin County Outer Loop, which will link Anna with the Dallas North Tollway, is under construction, with crews working on a frontage road west of U.S. Route 75. State highway authorities also recently approved a six-mile extension to the toll road that will reach Celina and Prosper. __________________________________________________________________________________________________________________________________________ https://www.dallasnews.com/news/2023/12/18/dnt-expansion-north-could-start-in-the-spring-pending-ntta-vote/ Northbound traffic on the Dallas North Tollway (right) climb the newly opened bridge over U.S. 380 in Frisco, Texas, March 13, 2023. The North Texas Tollway Authority (NTTA) has opened the extension into the Town of Prosper to help meet future traffic demands due to growth and economic development in Collin and Denton counties.(Tom Fox / Staff Photographer) By Susan McFarland 6:00 AM on Dec 18, 2023 GMT-6 LISTEN The Dallas North Tollway project to extend the road north from U.S. 380 to the Grayson County line might start in the spring, if the North Texas Tollway Authority gives a nod of approval during its Dec. 20 board meeting. Michael Rey, media relations manager for NTTA, said if approved, work for the Phase 4 Corridor Project will begin in the spring of 2024. ADVERTISEMENT According to records filed with the state, the NTTA funded roadway project is expected to cost $183 million. Rey said the 13.7 miles of roadway will include construction of a six-lane urban tollway with three lanes in each direction. -------------------------------------------------------------------------------------------------- Construction of Dallas North Tollway Extension (From US Highway 380 to North of Frontier Pkwy). Construction of new main lane tollway facility between existing frontage roads consisting of new pavement, pavement widening, grading, drainage, CIP walls, bridges, signing, pavement markings, utilities, ITS infrastructure, toll gantries, illumination, irrigation, and landscaping. bid bond ONE HUNDRED THOUSAND DOLLARS ($100,000.00). Deadline to Submit Question - October 13, 2023 at 5:00 PM CT.

Post-Bid

Roads / Highways

$200,000,000.00

Public - State/Provincial

Paving, Site Work

284

13

181

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
213
Bidding Soon
5,008
All Active Projects
1,899
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.