BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Whistler, British Columbia. Completed plans call for site work for a bridge / tunnel.

The Resort Municipality of Whistler (RMOW) is requesting quotations from excavation contractors to install a 10m section of concrete box culvert and all associated excavation and civil works within Lost Lake Rd. Whistler BC. This project involves the installation of 4 concrete box culverts within Lost Lake Road to act as a Toad Underpass. As such, the RMOW is seeking the services of a contractor to complete the necessary excavation, removals, installation of the concrete box culverts, backfill and rip rap retaining walls. The scope of work shall include the following: 1. Provide all asphalt cuts, removal, and disposal off-site. 2. Provide all common excavation and temporary on-site disposal of material to permit box culvert installation. Existing fill may be suitable for some on-site reinstallation. Off-site disposal, if necessary, will be done at time and material rates in addition to the bid price. 3. Supply, install, and compaction of new 19mm subbase gravels including installation of 2, 100mm carrier pipe for future use (RMOW to supply). No services exist or are expected at this time. 4. Installation of 4 Pre-Cast Concrete Box Culverts as per Engineered Drawing by third party crane. RMOW to supply Box Culverts delivered on site including coordination, cost, and supply of third-party crane. 5. Supply and install suitable backfill and compaction. 6. Supply and install of suitable rip rap wing wall retainment including geotextile separation as per engineered drawing. 7. Supply, install and compaction of 19mm road base. 8. Traffic Control, construction fencing, and asphalt repaving are not in scope and will be completed by RMOW. Question Deadline 09/26/2023 at 2:00 PM PT Documents can be obtained from www.bcbid.gov.bc.ca or https://www.whistler.ca/business/doingbusiness/bid-opportunities

Post-Bid

Bridges / Tunnels

$100,000.00

Public - City

Site Work

6

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
44
Bidding Soon
1,822
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

October 30, 2023

Project location map

Lost Lake Rd, Whistler, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.