BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Petersburg, West Virginia. Completed plans call for site work for a water / sewer project.

Unit price contract to construct approximately 12,980 LF of 6", 51,280 LF of 4", 6,500 LF of 4" temporary line, 9,980 LF of 3", and 5,180 LF of 2" waterline, 37 gate valve and boxes, 3 fire hydrants, 710' highway boring, 430' stream crossings, 73 water meters and service settings, 22 service reconnects, 1 booster station, 6 cut and cap existing main, and 12 tie in to existing mains; and other work required to provide a complete operating water system. A five percent (5%) Bid Bond or certified cashiers check must accompany all bids Contract Times: 210 Days

Award

Water / Sewer

$2,540,440.00

Public - County

Site Work

47

19

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
57
Bidding Soon
743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

December 18, 2023

Project location map

Multiple Locations, Petersburg, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.