BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2023 at 8:00 PM

Updated March 27, 2024

Site work for a road / highway in Oak Creek, Wisconsin. Completed plans call for site work for a road / highway.

The work, officially known as Project No. 23113, S. 13TH STREET UTILITY RELOCATION W. PUETZ ROAD TO W. DREXEL AVENUE, consists of constructing the following: 20 LF of 8" dia. PVC water main relay; 18 LF of 1" dia. water service relay; removal and replacement of 13 hydrant assemblies including hydrants, 6" gate valves, and 134 L.F. 6" dia. PVC hydrant leads; pavement and turf restoration; erosion control; and traffic control. BID GUARANTEE : 5 % Work could begin as early as November 13, 2023 The entire project shall be complete prior to March 8, 2024.

Bid Results

Roads / Highways

$243,212.00

Public - City

Site Work

15

9

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
260
Bidding Soon
2,805
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2023

November 13, 2023

Project location map

South 13th Street, Oak Creek, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.