BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work for a water / sewer project in Virginia Beach, Virginia. Conceptual plans call for site work for a water / sewer project.

Update:This project is for the implementation of water quality improvement projects within the Southern Rivers watershed. These water quality improvement projects may consist of new stormwater management facilities from the Virginia BMP Clearinghouse, new practices allowed through the Chesapeake Bay Program BMP Expert Panel Reports, and modifications to existing stormwater management facilities to improve pollutant removal efficiency. This project will also fund necessary acquisition of easements or property for the construction of the stormwater management facilities. The project includes associated storm drainage system improvements for the performance of the stormwater management facility. The projects will be implemented to reduce pollutants from existing developed areas especially areas that are not treated by existing stormwater management facilities. This watershed is part of the Albemarle Sound and includes North Landing River, West Neck Creek and Back Bay watersheds. Some projects currently planned include the Brigadoon Wet Pond, Bellamy Woods, and the Salem Village Water Quality Improvement Projects. Project is included in City of Virginia Beach Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://s3.us-east-1.amazonaws.com/virginia-beach-departments-docs/budget/Budget/Proposed/FY-2025/FY25-Proposed-CIP-Budget.pdf This project is for the implementation of water quality improvement projects within the Southern Rivers watershed. These water quality improvement projects may consist of new stormwater management facilities from the Virginia BMP Clearinghouse, new practices allowed through the Chesapeake Bay Program BMP Expert Panel Reports, and modifications to existing stormwater management facilities to improve pollutant removal efficiency. This project will also fund necessary acquisition of easements or property for the construction of the stormwater management facilities. The project includes associated storm drainage system improvements for the performance of the stormwater management facility. The projects will be implemented to reduce pollutants from existing developed areas especially areas that are not treated by existing stormwater management facilities. This watershed is part of the Albemarle Sound and includes North Landing River, West Neck Creek and Back Bay watersheds. Some projects currently planned include the Brigadoon Wet Pond, Bellamy Woods, and the Salem Village Water Quality Improvement Projects. Project is included City of Virginia Beach Fiscal Year 2025-2030 Page no 315 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project is for the implementation of water quality improvement projects within the Southern Rivers watershed. These water quality improvement projects may consist of new stormwater management facilities from the Virginia BMP Clearinghouse, new practices allowed through the Chesapeake Bay Program BMP Expert Panel Reports, and modifications to existing stormwater management facilities to improve pollutant removal efficiency. This project will also fund necessary acquisition of easements or property for the construction of the stormwater management facilities. The project includes associated storm drainage system improvements for the performance of the stormwater management facility. The projects will be implemented to reduce pollutants from existing developed areas especially areas that are not treated by existing stormwater management facilities. This watershed is part of the Albemarle Sound and includes North Landing River, West Neck Creek and Back Bay watersheds. Some projects currently planned include the Brigadoon Wet Pond, Bellamy Woods, and the Salem Village Water Quality Improvement Projects. Project is included in the Capital Improvement Plan for 2024-2029. As of October 2, 2023, project is funded for FY2025-2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$4,825,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
0
Bidding Soon
392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Virginia Beach, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.