BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and renovation of a mixed-use development in Tower, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a water / sewer project; for the renovation of a water / sewer project; water / sewer project; sidewalk / parking lot; and for the demolition of a water / sewer project.

**As of December 7, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Water Treatment Plant and Well Field Improvements Major components of the Work include: A. Well Field Improvements: Seal Wells No. 1, 2, and 3 and demolish the well houses located at the WTP site. Seal Well No. 3 (River) and demolish the well house at the Well Field site. Demolish the Well No. 6 pump house and install a new submersible pump and pitless adapter on Well No. 6. Replace Well No. 5 vertical turbine pump and discharge piping. Replace electrical equipment for Well No. 5 & 6 inside the Well No. 5 pump house and make controls improvements. Construct new Well No. 6 buried discharge piping and route through Well No. 5 pump house. Rehabilitate the Well No. 5 pump house. B. Water Treatment Plant Improvements: Remove old water tower foundation/footings at the WTP site. Abandon septic tank at the WTP site according to MPCA regulations. Construct new and modify buried process piping and valves at the WTP site. Construct new site access drives, parking, equipment pads, and fencing at the WTP site. Construct new treatment addition to the WTP including: Cast in place concrete chlorine contact tanks (2), clearwell pump chamber, footings, stoops, and building slab. Pre-cast concrete walls and ceilings. Membrane roofing system. Packaged Gravity Treatment Units. Vertical Turbine High Service Pumps. Process piping and valves. Plumbing, HVAC, Electrical, and Controls. Existing WTP rehabilitation including: HVAC improvements. Plumbing improvements. Electrical and controls improvements. Demolition of existing treatment equipment and chemical feed systems. Construction of new chemical rooms and chemical feed systems (within footprint of existing WTP). Construction of new mechanical room and laboratory/control room space (within footprint of existing WTP). Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. This Work shall be subject to minimum wages and labor standards in accordance with Federal and State requirements. Water Treatment Plant and Well Field Improvements Bid Opening Thursday, February 1, 2024 at 1:00 p.m Please join my meeting from your computer, tablet or smartphone: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_OTJhZTEwYWQtZDU1OS00NzE2LThkZWItNWZmMDQxMzc1MWQw%40thread.v2/0context=%7b%22Tid%22%3a%22642f4553-88f1-43dc-9a29-90842cd19d4c%22%2c%22Oid%22%3a%2248472820-a408-4d5c-b262-d033b1c6fa20%22%7d Meeting ID: 267 241 991 01 Passcode: hyRfj6 Or call in (audio only) +1 872-242-7640,,620451995# United States, Chicago Phone Conference ID: 620 451 995#

Award

Water / Sewer

$9,053,228.00

Public - City

Demolition, New Construction, Paving, Renovation, Site Work

117

39

8

13

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
9
Bidding Soon
73
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 14, 2024

img_map_placeholder

To Be Determined, Tower, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.