BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Detroit, Michigan. Completed plans call for site work for a transportation facility; road / highway; and for paving for a road / highway.

Reference Number 0000330359 The is for the renovation of concrete pavement surfaces throughout the CAYIA site where necessary. See attached site plan. This will include pre-construction, construction and post-construction based on the attached professional set of engineering documents and specifications. This work will entail collaboration with CAYIA staff and the Detroit Building Authority (DBA) to develop a successful plan for implementation. Question Acceptance Deadline 09/27/2023 12:00 PM EDT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Certified Payroll - Contractors License Required - Insurance Required - License Required Bonding Requirements - Bid Bond 3 % - Performance Bond 100 % - Payment Bond 100 % These capital improvements will consist of work to rehabilitate the southeast apron pavement of the Coleman A. Young International Airport (CAYIA) at 11499 Conner St, Detroit, Michigan 48213. The project consists of two bid alternates for rehabilitation of the Passenger and Executive Terminal Aprons on the southeast side of the airfield. The following improvements are scoped between each bid alternate: Bid Alternate 1: Milling 3" Portland cement concrete and repaving 3" of hot mix asphalt on approximately 12,550 SY, including selective spall and joint repairs outside of the mill/overlay areas on both the Passenger and Executive Terminal Aprons. Bid Alternate 2: Milling 3" Portland cement concrete and repaving 3" of hot mix asphalt on approximately 7,550 SY, including selective spall and joint repairs outside of the mill/overlay areas on the Passenger Apron. Selective slab and joint repairs, including full depth Portland cement concrete slab replacement on the Executive Terminal Apron. See EXHIBIT B for a site plan of the project. This will include pre-construction, construction and postconstruction based on the attached professional set of engineering documents and specifications. This work will entail collaboration with CAYIA staff and the Detroit Building Authority (DBA) to develop a successful plan for implementation. The CAYIA rehabilitation of the southeast apron pavement is expected to be substantially completed no later than November 22, 2023.

Bid Results

Transportation Terminals

$1,136,548.00

Public - City

Paving, Site Work

16

11

2

6

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
184
Bidding Soon
2,561
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2023

October 26, 2023

Project location map

11499 Conner St, Detroit, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.