BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Lititz, Pennsylvania. Completed plans call for the addition of a 360,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Comprehensive renovations and additions to the existing Warwick High School. 2. The existing building totals 360,000 square feet on two floors with additional crawl spaces and pipe tunnels for systems distribution. The additions provide an additional 1500 square feet of space to support the district athletic needs. 3. Work includes but is not limited to selective demolition to accomplish new work, reinforced concrete footings, concrete slab on grade, metal roof deck supported by steel bar joists and beams supported by CMU load-bearing walls in select areas. 4. All of the existing built-up roofing system will be replace with an EPDM adhered roofing system including tapered insulation over existing metal deck, gypsum roof deck and acoustical roof deck. 5. The exterior concrete masonry walls are clad in brick veneer at additions. The existing building includes concrete masonry walls and metal studs clad with brick veneer and stucco system with an EIFS finish. Existing brick and EIFS finish include cleaning and repairing as needed for a clean, finish exterior. 6. Exterior openings are primarily a thermally-broken aluminum storefront system. Some existing window and storefront systems will receive new hardware and weatherstripping for a weather-tight seal. 7. Interior partitions are a mixture of CMY, load-bearing CMU and gypsum wall board on metal stud partitions. 8. Interior doors are primarily solid core wood doors or hollow metal doors in hollow metal frames with some have interior aluminum storefront doors and frames. In many cases, existing door slabs are being replaced in kind. Hollow metal frames are to be prepped for new slab and refinished. 9. Finish flooring materials include Terrazzo, VCT, LVT, Carpet, Ceramic Tile, Resinous Flooring and Rubber Flooring. 10. The project includes replacement and expansion of existing utilities as well as comprehensive replacement and upgrades of existing mechanical, plumbing, electrical, technology and access control systems. 11. Portions of the work area within the building will received new fire suppression systems with a potential expansion at a later date. 12. The new additions will be separated into separate buildings, divided by two-hour fire walls. Existing rated walls within the existing structure will need to remain and not be compromised during construction and renovations of the existing school. 13. New gymnasium equipment, accessories, technology lab equipment, and low voltage systems will be supplied with the project.

Award

Educational

$66,591,400.00

Public - County

Addition, Demolition, Renovation, Site Work

791

152

696

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
284
Bidding Soon
3,688
All Active Projects
1,532
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 12, 2023

December 28, 2023

img_map_placeholder

301 W Orange St, Lititz, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.