BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a data center facility in Boca Raton, Florida. Working plans call for the renovation of a data center facility.

This Project has been Withdrawn Counties: Palm Beach Road Name: Air Handler Units Replacement at Boca Tolls Data Center Limits: Midpoint Project(s): 40670935206(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 250 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 Description: The work specified in this Contract consists of providing all labor, materials, equipment and incidentals necessary to perform replacement of existing two (2) chilled water variable volume, modular air-handling units and associated chilled water system, electrical rework and ductwork modifications located at Boca Tolls Data Center, 7941 Glades Road, Boca Raton, Florida 33434, on the mainline of Florida's Turnpike (SR 91), Exit 75. No U-turns shall be permitted as a condition of this Contract, except at Service Plazas No Pre-bid Conference Will Be Held for This Project. Question Deadline 10/10/2023 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 005 Air Handler Units Replacement Project has been withdrawn

Final Planning

Data Centers

$300,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
58
Bidding Soon
1,180
All Active Projects
500
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

January 17, 2024

img_map_placeholder

7941 Glades Rd, Boca Raton, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.