Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a swimming pool in Scottsdale, Arizona. Completed plans call for the renovation of a swimming pool.
Eldorado Pool Solar System - This project was originally envisioned as a solar water heating system, but the city would like to consider the option of a photovoltaic system to offset year-round electrical loads and possible future conversion to an electric heating system in lieu of the current natural gas boiler. The city projects an approximate 200KW maximum system size. System would be mounted on parking canopies provided by the DBM under this contract. Construction budget for this site is $360,000. Questions must be received in writing by Noon, December 28, 2023. Responses to questions will be posted to the City's website, at the address above, by close of business, Wednesday, January 3, 2024, by addendum. Eldorado Pool Complete 4/30/26 The City of Scottsdale reserves the right to reject any oral Statements of Qualifications, to waive any informality or irregularity in any Request for Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. A summary of the GMP with a total for each of the components of the GMP as listed in its definition in Article 1 as shown in the table below: C. Schedule of Values - spread sheet with the estimated bid or cost organized by subcontract categories, allowances, bid contingency, general conditions costs, taxes, bonds, insurances, and the DBM's construction phase fee. The supporting document for the spreadsheet must be provided in an organized manner that correlates with the schedule of values. The backup information shall consist of the request for bids, bids received, and clarification assumptions used for the particular bid item listed on the schedule of values, if applicable: material costs, equipment costs, labor costs, hourly labor rates, and total cost. Labor costs shall include the employee classification, benefits, payroll taxes and other payroll burdens. The total cost for any portion of the work to be performed by subcontractors shall include subcontractor overhead and profit. Production rates, transportation and other facilities and services necessary for the proper execution of the work, whether temporary or permanent, and whether or not incorporated or to be incorporated into the work. Copies of quotations from subcontractors and suppliers. Memoranda, narratives, consultant's reports and all other information used by the DBM Contractor to arrive at the GMP. The GMP must include all assumptions, descriptions and a breakdown of all allowances.
Post-Bid
Swimming Pools
$360,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2024
May 13, 2024
2301 N Miller Rd, Scottsdale, AZ
Related To This Project
Scottsdale, AZ
Bid Date: Jan 11 2024
Scottsdale, AZ
Bid Date: Feb 16 2024
Scottsdale, AZ
--
Scottsdale, AZ
Bid Date: Mar 01 2024
Scottsdale, AZ
Bid Date: Feb 13 2024
Scottsdale, AZ
Bid Date: Feb 01 2024
Scottsdale, AZ
--
Scottsdale, AZ
--
Scottsdale, AZ
--
Scottsdale, AZ
--
Scottsdale, AZ
--
Scottsdale, AZ
Bid Date: Dec 22 2023
Scottsdale, AZ
Bid Date: May 01 2024
Scottsdale, AZ
Bid Date: Nov 27 2023
Scottsdale, AZ
Bid Date: Dec 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.