BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Saginaw, Michigan. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000330335 The City of Saginaw is soliciting sealed bid proposals for the Riverfront Gateway Park Improvements with specifications as shown in bid document. Question Acceptance Deadline 09/26/2023 03:00 PM EDT Questions are submitted online No Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Insurance Required Bonding Requirements - Bid Bond 5 % This section describes the method of measurement and basis of payment for all items of the work included in the Contract and indicated in the Bid Proposal. Provide all labor, material, tools, equipment and services required to complete the Work included in the Contract Documents. Items described in the Specifications and indicated on the Drawings, but not shown in this specification section, are considered incidental to the Project. B. Each bid item on the bid form includes all work items required to construct the work as shown on the drawings and indicated in the specifications, including those items not specifically stated below in this section. C. From time to time. Contractor may receive written authorization to perform additions to or deletions from the Work, on a Unit Rate Price basis; the costs of Changes shall be calculated in accordance with the Unit Rate Pricing or Add/Deduct indicated on this Bid Form. Unless otherwise noted, each Unit Rate Price includes all direct and indirect costs for labor, equipment, transportation, testing services, general work expenses, applicable taxes, overhead, and other costs required to complete the work. 1. The all-inclusive Unit Rate Prices are fixed for the duration of this Contract, and not subject to escalation. 2. The Unit Rate Prices shall include all Work the Contractor is required to perform without regard to the quantities involved, difficulty in performing the Work, materials or equipment required, and specific handling of materials and equipment. 3. All Unit Rate Prices shall apply at 100% of their value for both additions and deletions to the Scope of Work, unless mutually agreed to otherwise in accordance with the Contract Documents.

Bid Results

Playgrounds / Parks / Athletic Fields

$490,491.00

Public - City

Site Work

13

17

7

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
58
Bidding Soon
966
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

November 13, 2023

img_map_placeholder

To Be Determined, Saginaw, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.