BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Kenosha, Wisconsin. Completed plans call for the renovation of a fire / police facility.

Sealed bids for furnishing all labor and materials necessary for the construction of: Project #22-1575 Kenosha Fire Station 7 Renovations all in accordance with specifications on file in the office of the Director of Public Works. The project includes the removal and replacement of the existing windows, some of the exterior doors, as well as some of the exterior façade. The interior framing of the exterior wall is being removed and replaced and other Work indicated in the Contract Documents. Each bid must contain the full name of every person or company interested in the same and must be accompanied by a contract and bid bond, a certified check, or a bank cashiers check, in the sum of five per cent (5%) of the bid, payable to the City of Kenosha as a guarantee that if the bid is accepted, a contract will be entered into and its performance properly secured within fifteen (15) days of the award of contract. Should any bid be rejected, such check will be forthwith returned to the bidder, and should any bid be accepted, such check will be returned upon the timely and proper execution and securing of the contract. In case the successful bidder shall fail to execute the contract and performance bond, the amount of the bid bond or check shall be forfeited to the City as liquidated damages. The form provided for Bidders Proof of Responsibility shall be completed and returned to the Director of Engineering not less than five (5) days before the date of bid opening. The successful bidder shall be required to furnish Workers Compensation and Liability Insurance as enumerated in the specifications. The City of Kenosha reserves the right to reject any or all bids, or to accept any bid considered most advantageous to the City of Kenosha. Removal and replacement of the existing windows, some of the exterior doors, as well as some of the exterior façade. The interior framing of the exterior wall is being removed and replaced and other Work indicated in the Contract Documents.

Bid Results

Fire / Police

$625,800.00

Public - City

Renovation

12

20

4

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
114
Bidding Soon
1,862
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

November 17, 2023

img_map_placeholder

9700 52nd St, Kenosha, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.