Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fire / police facility in Kenosha, Wisconsin. Completed plans call for the renovation of a fire / police facility.
Sealed bids for furnishing all labor and materials necessary for the construction of: Project #22-1575 Kenosha Fire Station 7 Renovations all in accordance with specifications on file in the office of the Director of Public Works. The project includes the removal and replacement of the existing windows, some of the exterior doors, as well as some of the exterior façade. The interior framing of the exterior wall is being removed and replaced and other Work indicated in the Contract Documents. Each bid must contain the full name of every person or company interested in the same and must be accompanied by a contract and bid bond, a certified check, or a bank cashiers check, in the sum of five per cent (5%) of the bid, payable to the City of Kenosha as a guarantee that if the bid is accepted, a contract will be entered into and its performance properly secured within fifteen (15) days of the award of contract. Should any bid be rejected, such check will be forthwith returned to the bidder, and should any bid be accepted, such check will be returned upon the timely and proper execution and securing of the contract. In case the successful bidder shall fail to execute the contract and performance bond, the amount of the bid bond or check shall be forfeited to the City as liquidated damages. The form provided for Bidders Proof of Responsibility shall be completed and returned to the Director of Engineering not less than five (5) days before the date of bid opening. The successful bidder shall be required to furnish Workers Compensation and Liability Insurance as enumerated in the specifications. The City of Kenosha reserves the right to reject any or all bids, or to accept any bid considered most advantageous to the City of Kenosha. Removal and replacement of the existing windows, some of the exterior doors, as well as some of the exterior façade. The interior framing of the exterior wall is being removed and replaced and other Work indicated in the Contract Documents.
Bid Results
Fire / Police
$625,800.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 18, 2023
November 17, 2023
9700 52nd St, Kenosha, WI
Related To This Project
Kenosha, WI
Bid Date: Oct 19 2023
Kenosha, WI
Bid Date: Dec 07 2023
Kenosha, WI
Bid Date: Nov 01 2023
Kenosha, WI
Bid Date: Nov 14 2023
Kenosha, WI
Bid Date: Nov 03 2023
Kenosha, WI
Bid Date: Nov 01 2023
Kenosha, WI
Bid Date: Nov 21 2023
Kenosha, WI
Bid Date: Feb 03 2022
Kenosha, WI
Bid Date: Aug 31 2022
Kenosha, WI
Bid Date: Jul 08 2022
Kenosha, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.