BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2023 at 8:00 PM

Updated June 12, 2025

Site work for a mixed-use development in Beacon Falls, Connecticut. Completed plans call for site work for a educational facility.

Proposed work includes removal of the existing asphalt base running track, and perimeter chain link fencing and installation of a new asphalt base, urethane surfacing & perimeter chain link fencing. Work also includes various alternates for renovating the interior natural turf athletic field or completely replacing the interior field and drainage and replacing it with synthetic turf. Alternates also include installation of new pedestrian lighting and new Public Address system at the existing pressbox. The Regional School District #16 reserves the right to accept or reject any or all options, bids, or proposals. Question Deadline 09/29/2023 at 5:00 PM ET Any questions or requests for clarifications shall be submitted in writing, via. Email to adileone@region16ct.org This bid/proposal covers the requirements of Regional School District #16 and Woodland CIP in Beacon Fall, CT. Proposed work includes removal of the existing asphalt base running track, and perimeter chain link fencing and installation of a new asphalt base, urethane surfacing & perimeter chain link fencing. Work also includes various alternates for renovating the interior natural turf athletic field or completely replacing the interior field and drainage and replacing it with synthetic turf. Alternates also include installation of new pedestrian lighting and new Public Address system at the existing pressbox. . This bid/proposal covers the requirements of Regional School District #16 and Woodland CIP within the town of Beacon Falls for all the necessary trades. Bidders will include all labor, materials, equipment, supplies, and services to fulfill the requirements of these bid specifications. The Work generally includes demolition of the track surfacing, including asphalt, saw cutting and repaving, Fulldepth and asphalt depth track paving. Chain link fencing, drainage and grading, as required to accommodate the new track cross-section and elevations. Construction includes repair and re-establishment of existing subgrades, installation of a new asphalt track and resurfacing, field events as well as new perimeter fencing, asphalt walks & drainage. Alternates include various levels of restoration to the interior natural turf athletic field, and an alternate to completely replace the interior field with synthetic turf as well as alternates for a new Public Address system and Pedestrian lighting at the adjacent pathway. Refer to Alternates section and site plans for detailed breakout of alternates.

Post-Bid

Educational

$1,200,000.00

Public - County

Site Work

21

13

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
825
Active Projects
290
Bidding Soon
6,819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

November 27, 2023

Project location map

135 Back Rimmon Rd, Beacon Falls, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.