BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Diego, California. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Scope of Services The City of San Diego received Federal Highway Administration (FHWA) Highway Bridge Program (HBP) Funding administered through the California Department of Transportation (Caltrans) to rehabilitate the Fairmount Ave Bridge Left/Right. The bridges, located southeast of Mission Valley in the City of San Diego, are classified as "Structurally Deficient" by the California Department of Transportation (Caltrans). The existing bridges are located on Fairmount Avenue at the intersection of Aldine Drive. Fairmount Avenue is a divided four lane Urban Principal Arterial that runs south-north with a posted speed limit of 55 mph in the northbound direction and 50 mph in the southbound direction. It is a local route that primarily services the communities of Kensington and Talmadge south of I-8 and provides additional connectivity to Normal Height and City Heights. The substructure of both existing bridges consists of three continuous reinforced concrete box girder spans on two open end reinforced concrete diaphragm abutments and two reinforced concrete column bents, supported by steel piles. Each bridge carries two lanes of vehicular traffic with no shoulders and no sidewalk. The overall width of each bridge deck is 28 feet. Phase 1 of Fairmount Avenue bridge rehab east/west project that included preliminary engineering studies and evaluations, preliminary environmental and preliminary geotechnical study has been completed. Different alternatives for bridge rehabilitation and replacement were developed and final alternative 3A is selected as the following: Proposed project will involve widening the existing bridges with precast concrete box girders to provide two 12-foot lanes, an 8-foot outer shoulder, a 4-foot inner shoulder, and a barrier-separated 6-foot sidewalk. Other design elements include providing 6-foot sidewalks along the north side of Aldine Drive between the ramps to Fairmount Avenue, a retaining wall along the northbound Fairmount Avenue on-ramp, and ADA upgrades. Under this proposal, consultant will need to provide work for phase 2 that includes: Preparation of environmental document (CEQA and NEPA), final plans, specifications, and estimates (PS&E) for final alternative selected in Phase 1. Also, to include any environmental studies, technical reports or memorandums that may be deemed necessary to complete PS&E phase. Engineering support during the bid and award phase for construction contract and engineering support during construction, including the assistance in preparation of the As-builts for the project upon construction completion. Online Q&A No Estimated Bid Value Between $1 Million and $1.4 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$1,400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.