EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in West York, Pennsylvania. Completed plans call for the renovation of a educational facility.

As of October 26,2023, project was awarded . For Prime General Contractor it is awarded to CB construction with $79,748.00, Prime HVAC Contractor awarded to Hosler Enterprise with $616,000.00 and Prime Electrical Contractor awarded to Orbit Technologies Inc., with $18,400.00. Total awarded amount is $714,148.00. The project work consists of contracts listed as Prime General Contractor, Prime HVAC Contractor, and Prime Electrical Contractor as referred to herein. The proposed project consists of the work detailed in the contract documents by each prime contract: 1.General Contract: Removal of CMU wall. Removal of H.M. Door and Frame. Tooth new CMU jambs and install jamb block to create new masonry openings. Install structural steel beams as detailed to carry existing CMU and steel mezzanine to remain. Scheduled CMU to be removed shall be replaced with concrete minimum 4 inches below adjacent floor with concrete to match existing. Exterior hot dipped galvanized steel dunnage for new cooling tower. 2. HVAC Contract: Remove existing cooling tower, chiller, partial piping sections, refrigerant monitor, selected water piping in mechanical room. Replace existing EVAPCO forced draft cooling tower in kind and connect to existing piping. Replace existing JCI chiller with a new JCI mag-lev 165 ton water cooled centrifugal chiller and connect to existing piping. Replace existing condenser water pump on existing vibration isolation base and connect to existing piping. Replace existing roof mounted exhaust fan on existing curb. Add refrigerant purge exhaust fan and ductwork. Provide starters for replacement equipment. Provide JCI controls for all HVAC units and integrate to existing system. 3. Electrical Contract: Remove selected receptacles, switches, conduits, breakers. Provide conduit, wire and breakers for new HVAC units. Bid security in the form of a Bid Bond by acceptable surety or certified check made payable to the Northeastern School District in the amount of 10 percent (10%) of the bid amount and must accompany each bid Notice is hereby given to bidders that this project is subject to Pennsylvania Prevailing Wages. the Contract, with a proper Performance and Payment Bond, covering 100 percent of the Contract price as security for the faithful performance of all work under the Contract and payment of all charges in connection therewith, including a maintenance clause for ten percent (10%) of the Contract sum for a period of one (1) year from the date of final acceptance. The completion date shall be May 1, 2024. Question Deadline 10/06/2023 at 12:00 PM ET Information regarding process, policy, and fingerprinting locations may be found at www.pa.coqentid.com All requests for site visits and inspection appointments should be directed to Jamie Pratt, Director of Physical Plant, Northeastern School District Administration Building, 41 Harding Street, Manchester, PA 17345, telephone number 717-266-3667, email prattj@nebocats.org. Requests for technical information and bidding requirements should be directed to James Baumgardner, Principal / Director of Architecture, CORE Design Group, 155 W. Market Street, Suite 200, York, PA 17401, telephone 717-741-2046, email jbaumgardner@core-designgroup.com.

Award

Educational

$714,148.00

Public - County

Renovation

7

17

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Flexible Connectors, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Facility Electrical Power Generating and Storing Equipment
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
107
Bidding Soon
1,880
All Active Projects
870
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

October 26, 2023

img_map_placeholder

570 Copenhaffer Rd, West York, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Conewago Elementary School Chiller Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.