BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Denver, Colorado. Conceptual plans call for site work for a water / sewer project.

Projected Scope of Work PROJECT OBJECTIVES The primary objectives of this Project are twofold. The first objective is to provide analysis and design services to produce all construction documents necessary to replace the existing concrete emergency spillway at Upper Highline Dam. The following summarize specific scope items anticipated to be included in the project. It should be noted that a Spillway Hydrologic Adequacy Report for Upper Highline Dam, which included and Inflow Design Flood Hydrology Analysis and Hydrologic Hazard Classification Analysis, was approved by the SEO in 2021. This report is included in the RFQ supplemental information Google Drive. The Consultant should thoroughly review this document and note any shortcomings or discrepancies that are of sufficient concern that the Consultant does not believe that they can use the report as a basis of design. a. Alternatives analysis: Includes review of all record documents, drawings, previous design reports, analysis, etc. to help achieve a holistic understanding of the structure and aid in development of alternatives. Develop up to three design alternatives and provide schematic level drawings, preliminary analysis, and preliminary cost estimates for each alternative. b. Perform all necessary hydraulic calculations, modeling, and sensitivity analyses on the selected alternative to ensure design compliance with the SEO Rules and Regulations. c. Develop and provide a complete design submittal package in accordance with Rule 6 of the SEO Rules and Regulations. d. Assist CPW with development of a construction bid package to be used in a formal Invitation for Bid (IFB) solicitation. This scope element should include assistance with select front end specifications such as bid schedule, summary of work and measurements and payments. This scope item may be adjusted if CPW elects to pursue a CMGC delivery method for this project The second, objective is to evaluate the current seepage condition and subsequently the potential for internal erosion (CLE) through the foundation leading to a dam failure. If results from this objective indicate that internal erosion is a dam safety concern that should be addressed, then seepage mitigation design may be included as an amendment to the design contract. The following summarizes the overall scope items related to the seepage and internal erosion analysis anticipated to be included in the project. a. Review all historic documentation, past reports, etcetera to help achieve a holistic understanding of the structure and aid the evaluation. b. Testing of water samples from foundation piezometers and the downstream toe area for sulfate levels. It should be noted that Upper Highline Reservoir's primary water source is Government Highline Canal which has significant agricultural loading. c. Analyze samples collected from item (b). Based upon the chemical makeup of the results, evaluate the potential for further gypsum dissolutioning that would lead to initiation of internal erosion. d. Based upon the test results and analysis in the items (b) and (c) above, analyze the potential for progression to occur through a seepage model given past improvements. e. Based upon the results for scope items (a)-(d) revisit 2023 CDSE results for PFM 9 and evaluate if the additional analysis has changed the likelihood of the PFM.

Conceptual

Water / Sewer

$750,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
109
Bidding Soon
1,651
All Active Projects
681
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 1, 2023

June 30, 2025

img_map_placeholder

Multiple Locations, Denver, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.