BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.

CSO-GC-SFS-OH-CP2: Second construction phase (CP2) in the overall construction of the OH-007 Gowanus Canal CSO Facility. During this CP2 phase, the below grade substructure of this facility will be constructed. In order to accomplish this, a cement-bentonite support-of-excavation groundwater-cutoff slurry wall will be constructed around the perimeter of the new facility along with braces across the footprint of the Facility. This will be followed by the excavation of soil within this perimeter where the new substructure will be built. Due to past industrial use of the site, the soil to be excavated is contaminated with hazardous materials. Therefore, soil testing will be required to determine how to dispose of it, treat it, or reuse it. Air emissions will need to be closely monitored using a Community Air Monitoring Program to ensure that hazardous air contaminants are not released into the surrounding community during the excavation process. Additionally, a construction water treatment system will need to be constructed in order to treat and discharge groundwater that may be contaminated. Following excavation the water-retaining substructure will be constructed using cast-in-place concrete to provide durability, watertightness, and structural integrity. The substructure will include a screening area, five storage cells, an effluent channel, and a pump wet well to pump the stored CSO back to the main interceptor sewer in the area. This new substructure will have the capacity to store four million gallons of CSO. Question Deadline 10/06/2023 All questions must be submitted in the "Discussion with Buyer" forum in PASSPort. All questions and requests for additional information should be submitted through the PASSPort Disc *This project has been awarded and all trades have been let.

Under Construction

Water / Sewer

$312,086,363.00

Public - City

Site Work

179

24

73

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
243
Bidding Soon
4,520
All Active Projects
2,179
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

July 22, 2024

img_map_placeholder

2nd Avenue,, New York, NY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.